L-10388 Tear-down Documentation
Schedule notes:
- Link to smartsheet schedule: https://app.smartsheet.com/sheets/j9j3gHvQMqCHWf8C4j25mMXHGfcpGwJf23mPX4M1?view=gantt
- Starting W 18 Sept 2024: MXI installation (after final shift of L-10425)
- Starting Th 27 Sept 2024:
- F-XRTS and B-XRTS removal (after photon MD time for spectrometer calibration)
- Installation commences.
- W 9 Oct 2024: Tentative SAXS checkout
- M 14 Oct 2024 - First shift.
...
| B-XRTS | XYZ | IMS |
| MEC:TC1:MMS:{07,08,09} for Z,Y, X. | Yes | Yes | Using old XRTS stage pmgr: XUV Z/Y/X |
| F-XRTS | Z | IMS | MEC:USR:MMS:22 | Using new XRTS stage PI motor: HD-26 to DSUB-15 pmgr: FWD XRTS X | |||
| Y | IMS | MEC:TC1:MMS:23 | Using new XRTS stage PI motor: HD-26 to DSUB-15 pmgr: FWD XRTS Y | ||||
| X | IMS | MEC:USR:MMS:25 | Using new XRTS stage PI motor: HD-26 to DSUB-15 pmgr: XUV X |
Motors
Remaining task list
Configuration Information
...
| Device | Motor | Type | Hardware Address | EPICS PV | Cabled? | Running? | Comments |
|---|---|---|---|---|---|---|---|
| SPL M5 | Tip | Newport |
| MEC:PPL:MMN:09 | Yes | Yes | TRA12PPV6 |
| Tilt | Newport |
| MEC:PPL:MMN:10 Note mismatch with physical card number. (should be MMN:11) | Yes | Yes | LTA2PPV6 | |
| TSO | Focus | Newport |
| MEC:PPL:MMN:07 | Yes | Yes | LTAHLPPV6 |
| Hor | Newport |
| MEC:PPL:MMN:08 | Yes | Yes | LTAPPV6 | |
| Vert | Newport |
| MEC:PPL:MMN:11 Note mismatch with physical card number. (should be MMN:12) | Yes | Yes | UTS150PPV6 | |
| SPL Ref Laser | IMS |
| MEC:USR:MMS:19 | Yes | Yes | pmgr: VT-50-100-L | |
| Power Meter Stage | IMS |
| MEC:USR:MMS:21 | Yes | Yes | pmgr: VT-50-300 | |
| Vacuum Iris | IMS |
| MEC:USR:MMS:20 | Yes | Yes | pmgr: Vacuum Iris | |
| OAP | XYZ | IMS |
| MEC:TC1:MMS:{14,15,16} | Yes | Yes | pmgr: BWD XRTS X/Y/Z Position |
| Filter | X | IMS |
| MEC:USR:MMS:23 | Yes | Yes | pmgr: VT-50-100 changed UREV from 1.0 to 0.5. |
| Zyla | 500mm | Newport |
| MEC:PPL:MMN:24 | Yes | Yes | IMS500PP |
| XTCS | Linear | Newport |
| MEC:PPL:MMS:17 | Yes | Yes | UTS150PPV6 |
| RotatIonal | Newport |
| MEC:PPL:MMS:18 | Yes | Yes | URS50BPPV6 | |
| Filter Wheel | IMS |
| MEC:TC1:MMS:22 | Yes | Yes | Rotation stage + limit switch | |
| MXI | Hexapod | Small Hexapod |
| MEC:HEX:02 | Yes | Yes | HEX2 aka "Analyzer 1" |
| Z Stage | IMS |
| MEC:USR:MMS:22 | Yes | Yes | pmgr: MXI-Z-Stage | |
| FSI | Hexapod | Small Hexapod |
| MEC:HEX:03 | Yes | Yes | HEX1 ?? |
| VT-50 Stage | IMS | MEC:USR:MMS:25 | pmgr: VT-50-TBD |
Detectors
Detector | DAQ alias | Connection | Cabled? | In DAQ? |
|---|---|---|---|---|
| Andor Zyla | Zyla_xray_east |
| Yes | Yes |
| ePix100a | epix100a_3_xtcs |
| Yes | Yes |
| epix10k-540k | Epix10kaQuad0 | in-air TBD | Yes | Yes |
| TT Alvium | alvium_tt |
| Yes | Yes |
| Spot Alvium | alvium_spot |
| Yes | Yes |
| NF/FF Alvium | alvium_nf_ff |
| Yes | Yes |
| Alvium | alvium_fsi | On NW side of target chamber
| Yes | Yes |
| Alvium | alvium_tp | On NE side of target chamber
| Yes | Yes |
| Alvium | alvium_oap1 | On SE side of target chamber
| Yes | Yes |
| Alvium | alvium_oap2 | On SE side of target chamber
| Yes | Yes |