Attendees:  Leinani, Elena,Josh, Rebecca, Armin, Dennis, Eliazar, Abigail, Connor, Mitchell, Maggie, Patrick

 Announcements:

  • Rebecca out June 26-July9


Discussion:


  • Mirror Substrates TPRR - received report - updating drawings and ESDs- aiming to complete by end of week
    • procurements -
      • Req started for substrates - started
      • ASP started
    • Eliazar will approve on Armin's behalf
  • Laser Transport EPR  -  report received from Brice
    • FEH configuration updates
      • list of options? still waiting
      • A/E feedback - october?
      • laser needs for IP1, IP3 in CXI - september?
    • 400W baseline- Matthias Kling - first stab by end of this week?
    • decisions and path forward on September timeframe
  • Lasers PDR - Week of July 15? maybe late July?
    • ESD progress taking some resource efforts away from pdr prep
      • meeting tomorrow-
    • Doc preparation
    • Slides being prepared
  • Controls
    • looking at documentation
    • review on wednesday?
    • see if components fit on stands?
  • Infrastructure -
  • Mechanical -
    • Infrastructure
      • RDS updates
      • rack layout
    • Elena working through collimator supports
      • CXi is adding a collimator next to PC2L5, PC2L4
      • BTm connectors interfering?
    • Design of shielding in hutch 4 - waiting for final requirements but basic design near completion
      • IM2L5 - location
        • needs a stand name
      • developing 2D drawings- working with Igor
      • BIO seismic
    • BCS sensor counts - looking at gate valve ties, etc
      • need to look at diffraction issues in the hutch
        • Mirror- is there a published note? MFX specific? Will will generate? Or edit DXS note?
        • redundant sensors?
      • need to update note
    • Diffraction - start building a note like in XPP?
    • XPP style Side boards would work for lasers?
      • re-do BIO
      • ejection and ATM
      • Mechanical team will engineer these systems (jim charge laser number?)/ Laser team will assist with analysis
    • MODS table location updated
      • final design for structure still in the works
      • Components to be added to tables