Shielding Mounted on the Target Chamber
These walls need to be stacked with lead every time they are installed/uninstalled from the hutch. They mount directly onto the Target Chamber.
- North wall shielding
- Installation Procedure: https://docs.google.com/document/d/1DPWUgR5BZEqSvc4Uro-cvxV4thmcgin6xoUPpjaIR8Q/edit?usp=sharing
- Materials: There is a black bin in the XRT with the lead bricks, metal frame, hardware, and hex driver. It has a label that says:
MEC Lead Storage
SPL shielding wall bricks
(North Target Chamber-mounted Wall)
- East Wall Shielding
- Installation Procedure: TBD
Shielding Walls on Wheels
There are 4 walls in total. 3 are the same and 1 is special.
- These may or may not be stacked with lead already.
- If orange RP stickers are present, the lead shielding cannot be dismantled without an RSWCF.
- They are stored in the XRT.
- We don't always need ALL of these walls installed. It depends on the experiment configuration. This should be quantified in the Final Design Review (FDR) powerpoint slides for each planned experiment.
- Three identical walls on wheels
- Any of these walls can be used to the North and Southeast of the Target Chamber.
- Materials: Each wall should have with it 4 pucks and anchoring hardware.
- Special wall on wheels
- It is the only one that can be anchored to the Northeast of the Target Chamber (see above). This is because it has 2 holes drilled in the yellow frame, for an extension foot for anchoring.
- Materials: The extension foot is usually sitting with the special wall. It should also have 4 pucks and anchoring hardware. You should still rest the wall on all 4 pucks during anchoring.
Shielding Wall Mounted to Laser Table
- This wall needs to be stacked with lead every time it is installed/uninstalled from the hutch
- This wall has a frame that anchors to the ground, some metal extensions to anchor to the laser table, a metal frame that holds the lead bricks
- Materials: There is a black bin in the XRT with lead bricks, hardware, and hex driver. It has a label that says:
MEC Lead Storage
SPL shielding wall bricks
(Laser Table-mounted Wall)