...
| MC Task | Jobs | CPU/job (mins) | Cal | Merit | SVAC | Total Cost |
---|---|---|---|---|---|---|---|
| backgnd-GR-v15r39p1-FullDay | 100000 | 15.124 | 49.1 GB | 20.1 GB | 23.6 GB |
|
Cost |
|
| $2520 | $8.35 | $3.40 | $4.01 | $2535 |
...
...
| MC Task | Jobs | CPU/job (mins) | Cal | Merit | SVAC | Total Cost |
---|---|---|---|---|---|---|---|
| backgnd-GR-v15r39p1-FullDay | 100000 | 15.124 | 49.1 GB | 20.1 GB | 23.6 GB |
|
Cost |
|
| $2520 | $8.35 | $3.40 | $4.01 | $2535 |
...