Attendees: Eliazar, Leinani, Elena,Josh, Rebecca, Eliazar, Connor, Abigail, Jim
Announcements:Near term Milestones:
Discussion:
- IPR Complete!
- Mirror Substrates TPRR - yesterday!
- Laser Transport EPR - waiting for report from Brice
- FEH configuration updates
- 400W baseline
- Lasers PDR - July?
- LCLS FEH workshop -
- rackspace - Mitchell met with Omar(IT/Data), Matt(BCS), (PPS) - follow ups next week? stakeholders needing space first
- Infrastructure -
- MFX RDS will be ready for interim release once we update rack items;
- need an RDS for mezz? for now just put note on line items; if we need an RDS for mezz in future, whose responsibility is it?
- control room RDS - not in project scope but we should provide feedback: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/exp/shared_docs/Experimental%20Systems/MFX/FEH%20Reconfiguration/FEH%20Hutch%204.5%20MFX%20Control%20Room_RDS%20%5B69%5D.docx?d=w82778d072cc34bf8a25fe887fbfbdc59&csf=1&web=1&e=JWrwbF
- Mechanical -
- XPP style Side boards would work for lasers? meet next week
- ATM reversal - which model number would we end up with? Leinani send part numbers to Jim/Elena
- Reference laser reversal - backpack and laser on same side??? - Leinani
-----
- ICD → LCLS MIE /HE - complete!
- KB Mirror
- Next review - May 23/24 or 28/29 (substrates, coating, vessel, combined review of all 3 systems) - exact date TBD depending on reviewer availability
- Docs for substrate and coatings review - all in review (should close by end of week)
- working on slides ~60%
- Spot size around new collimator after mirror is ~450-500um
- multiplexing -catch up? see slides - waiting for doc from Matthieu
- No hard target for defocus
- 50um is largest spot size (hard to get large spots at higher energies): PRD0294.4205 (PRD -0294)
- is still in draft....Meng's document...should we try to push this through?)
- focal range?
- 600mm upbeam (check range of energies)
- focal range?
- ESD's supporting documents need to be released prior to review
- Mirror model - check references
- Slides and Site setup by Thursday - Eliazar to help since Armin is out - https://slac.sharepoint.com/sites/lcls/lcls-2-he/exp/shared_docs/Forms/AllItems.aspx?id=%2Fsites%2Flcls%2Flcls%2D2%2Dhe%2Fexp%2Fshared%5Fdocs%2FReviewPrep%2F2024%2D02%5FOPT%2EFDR%2DMirrorBender&viewid=012af798%2D4ed1%2D479f%2D8124%2D9fed976423c3
- Integrating bypass for future passthrough- rad safety
- Opened rev for Instrument PRD - added 2 new requirements
- RP shielding
- Thermal Enclosure- coordinate with Laser team on space stayclears
- thermal analysis started to see how environment affects mirrors (straight translation!)
- interfaces to RDS
- multiplexing - how does this affect mirror motions?
- IP has to move?
- motion range looks ok
- prep folder?
- Next review - May 23/24 or 28/29 (substrates, coating, vessel, combined review of all 3 systems) - exact date TBD depending on reviewer availability
- Documents:
- Instrument PRD - R2 and out for review
- update schem.
- start review cycle
- Engineering notes - vacuum analysis - updated and ready for release
- Engineering notes - vacuum transient analysis - one more update
- Inst. ESD rev??
- ICD-1010 → capture scope changes - Rebecca this week (see above)
- Detector PRD out for signature? check progress? Stuck at Hong, Debarger (closed?)
Detector PRD vs delivery plan - noise and well depth- are figures ok? is 10000photons @ 8keV ok (well depth)? noise <75e- vs <100 e-xpp hole will be 5mm - we can reuse guidance tube design (same as epix 10k)mfx assumption was we needed slightly larger hole? needed for laser?@ 450 mm away from IP, 5mm is a bit close.
- Detector ICD - out for review soon
- Detector PRD - side facing, sensor area?? (not scoped)
- Detectors IRD in progress - Alex/Leland to look at
- LFAD details looking ok–some questions about cryolines?
- need SFAD - Leland has been updating
- SM-MM is required here...cut/paste
- ICD-Lasers
- out for review - signed ? pulled back? out for signatures again
- out for review - signed ? pulled back? out for signatures again
- Laser ESD
- out for review- revisions requested
- out for review- revisions requested
- Instrument PRD - R2 and out for review
- Mechanical Design
- Need 2x spare ports for Vat sensors (BCS sensors) on mirror chamber
- new requirement from shanjie "each vacuum zone shall have 2 vacuum sensors...unless hutch walls are safe from diffracted [beams]" - Req#PR1120.1043 https://slac.sharepoint.com/sites/pub/Publications/Forms/LCLSIIHE%20Physics%20Requirements.aspx?FilterField1=Document%5Fx0020%5FSub%5Fx0020%5FType&FilterValue1=Experimental%20Systems%20%28XES%29&FilterType1=Lookup&FilterDisplay1=Experimental%20Systems%20%28XES%29&id=%2Fsites%2Fpub%2FPublications%2FLCLSII%2DHE%2D1%2E4%2DPR%2D1120%2Epdf&viewid=c32bb2d4%2D9163%2D4ad0%2Da337%2D71d55c4d6363&parent=%2Fsites%2Fpub%2FPublications
- Elena - shielding enclosure for PPM
- space next to wall - check actuals to verify position
- Ref laser reverse - pin.
- remake or remove?
- reorient instead of making a new part.
- LIC model - configs ? not centered? Leinani
- LIC Assys Released: LCL5004-006876 (RH), LCL5004-009684 (LH)
- ATM reverse?
- MFX lasers want more access to tile - so want to swap orientation - can we(Dennis) mock up what this will look like?
- cxi is looking to reverse- just swap hardware with CXI?
- Leinani: "no new parts needed to reverse (some minor hardware) - just update traveller
- in order to configure on south side
- Laser team has mocked up routing - just kidding
- Endstation stay clear. - Jim is beginning to analyze
- How much will diagnostic stand move?
- anchor analysis
- meeting with Lasers on hutch interfaces - next week - send info before wednesday?
- Reference Laser - reversed version (Igor)
- Upstream optics - working around the LADM
- vacuum transient analysis in progress - engineering note ready for review - 1.4-EN-1116 (on working site)
- vacuum load analysis is also updated, revision pulled, ready for review (pending design changes) - 1.4-EN-0584 (on working site)
- shielding in H4 requirements collected, concept developed
- ray tracing for multiplexing - need decision on PC6L0 ID - meeting with Matthieu soon
- reverse reference laser? (Leinani looking into this for us)
- Need 2x spare ports for Vat sensors (BCS sensors) on mirror chamber
- Common components
- Small modification on exit window assy to include spacer
- How is procurement going? approvals needed?
- Can we modify collimator assy to include larger stand?
- Assy procedures
- walk through
- LCLS vac shop - are we sure they can output level 1 parts/chambers?
- service now for each assy ?
- multiple things tracked within this
- Leinani to catch Rebecca up...
- test case this week?
- Traveller - alignment team meeting tomorrow; very close!
- one more pass with controls - this wednesday during controls meeting
- space and time planning details
- TAPS Awarded - next steps?
- Can Angela help?
- Stopper FMEA
- engineering note (Josh/Rebecca) - emphasis on actions (on working site)
- Josh filled out more of the missing material - Rebecca please check
- prep for next meeting. try to close out FMEA
- vacuum chambers for PPMs etc is next large procurement
- Assembly Travelers
- revision for WFS - Divya/Maggie will edit
- we can apply these changes to other travelers too
- ATM configs - see notes above
- Exit window installation - tomorrow
- Multiplexing ramifications?
- XRT diagnostics/stopper
- Small modification on exit window assy to include spacer
- Controls
- Jana - server DAQ space check on Wednesday
- review rack space etc too
- Space hunting
- Meeting with Jana about mezzanine space this week - need at least one extra rack
- understand timeline for availability
- controls team will develop strategy (also have to consider cxi, dxs, etc)
- what will happen with SMB experiment - currently it is occupying a full rack -
- working on finding rack space for lasers
- are we accounting for all controllers at this point (90U)? Need to refine count.
- Window - 4 pane
- discuss traveler on wednesday
- preview of vac schematic last wednesday
- per new scope direction please estimate required controls design work
- multiplexing PMPS - documentation?
- need updated vacuum and mech. schematics
- Set up meeting with Matthieu regarding multiplexing scope
- Jana - server DAQ space check on Wednesday
- Multiplexing
- muliplexing lead: Matthieu Chollet
- Update from Hasan and Frank 12/8
- raytrace (need to get files from Lance and Frank)- received 1/16
- will start evaluating collimator location soon
- Laser Off-mods layout
- cable trays for transport
- PDR might slip into May
- Delta CDR for transport line in April
- Slides are drafted (Matt)
- some concepts are in the model - don't panic!
- Slides are drafted (Matt)
- Dennis catching up with current concepts
- Working on elevated table design, and side tables - accessibility
- Patrick working on optical layouts, pictures soon!
- extra space? underneath MODS table. (two chunks of spaces between legs) Lasers needs 24U underneath. Can we use that other 24U of space (low heat sources only)?
- looking for space for electronics (work with Christina Pino, Mitchell Cabral, Vincent Esposito)
- Controls rack shuffling - can laser team share rack profiles?
- Documents!
- Dennis - will touch base with Eli
- Working on design for off mods tiles - Patrick doing a first pass this week
- Off mods breadboard stand models (under MEC drift tube)
- Can we shift beampipe stand (MEC and CXI) upstream?
- Set up meeting for tile layout workflow
- Drift stand on MEC - would be nice to move
- Laser out coupling–what do you need in the beamline?
- CXI has an in-vacuum design? (maybe talk to Leslie)
- Space utilization - Patrick talk to Eli
- optics locations draft?
- optics categorization
- ATM tiles? need a final design?
- ejection layout
- IP
- LIC
- Diagnostic stand interfaces (breadboards)
- should attach to diagnostic stand?? not mods?
- need mods to stand?
- mount to floor instead?
- Laser Transport?
- Laser in coupling as designed should work as
- access on working site: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/wd/ICD/LCLS-II%20HE%20MFX%20Lasers%20ICD.docx?d=w73e52e9056f94e0cb9df481c8cd63f6d&csf=1&web=1&e=hJLtqF
- Rebecca reviewed - a few small comments
- drawing tree: (link)
- RDS- R2
- laser updates?
- update with Det power requirements
- CO2 updates
- temp requirement - refine based on laser results
- Equipment anchoring BIO review -complete
- stands - complete
- stopper - Jenna - complete
- Controls Coordination - meet up to discuss status
- CXI will host 16M detector power (one full size rack) but will it be close enough?
- penetration from CXI? existing cable route?
- back corner?
- Detectors - what about small detectors?? small 140k Epix HR/UHR
- OH Robot- yes, the robot will live on
- Robot OH rack...chiller lives up there, MPOD, server
- fiber infrastructure for 16M complete
- vacuum eplan complete and reviewed
- need new controllers in MFX (MKS 937s)
- motion eplan is complete - needs review
- common component connection
- CC FDR review
- FXT FDR last week - well done!
- XRT stand naming DONE
- Enclosures added to model
- Rack profile planning ongoing
- timing system?
- each hutch has an ATC crate
- data structure is different for HE - working with data and detectors team
- fast scope? or virtual?
- out of scope items - older vac equipment, cameras, and motors etc. : how is this tracked?
- estimate in progress
- DC power - running by power supply expert on our side
- Endstation scope add estimate: eplan dwg (cosilab) and estimate spreadsheet TBD
- CXI will host 16M detector power (one full size rack) but will it be close enough?
- Temperature monitoring
- Alex ordered more temperature loggers (10)
- will place at KB locations and around hutch
- Matt has old data - gave to Ariel
- Facilities
- Water Routing → change to general facilities topics
- RDS v2
- meet with Kingston to discuss options for CO2 cooling
- water routing work will be packaged with other facilities work and sent out for bid ~late summer
- RDS v2
- Water Routing → change to general facilities topics
- Detector Coord
- detector mover limits
- can move limit switches to get the stroke that we need
- use this info to determine max detector envelope for IRD.
- This Friday
- CO2 implementation
- scientist to decide on types, quantities, need for first light
- update PRDs?
- ICD and IRDs in progress
- interface details with detector mover
- detector mover limits
- Laser coordination
- temp requirement check - look at systems in place for more data
- Added - struts on granite stand
- Moved - the ion pump on diagn. std 2. next to ATM
- Model - updated coordinate systems; stayclears will be added to laser model soon
- ELi - will add stayclears for under table patch panels - need clearance requirements from Serge
- Patrick working on PRD details (cacls to check if we can meet requirements)
- ICD/PRD/Laser ESD still in progress
- Focus on PRD (working on CXI first)
- Patrick touch base with Alex?
- DxS-MFX transport line is still not finalized
- but it is the preference
- ATM config?
- up to 45 deg needed??? possible?
- difference btwn L2Si vers and HE vers?
- we are also ready to design laser out-coupling when laser team has details/requirements available
- Does the detector situation matter? beam tube size? this geometry is important...
- ideal hole diameter?
- what is needed?
- what is common ?
- document on confluence and eventually in PRD
- Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
- thermal issues (see below)
- temp requirements?
- current requirement in RDS: +/-0.5 deg C
- better if laser outside of hutch?
- Installation
- CC RFI dates.
- KB should fit now into schedule
- Radiation safety
- Need radiation safety PRD from Shanjie
- raytace needs to incorporate gantry error
- fast sensor - need to run for MFX
- Elena to start this week. do requirements change for MFX in any way?
- passive shields - Abigail
- hands on 80/20 experience
- photon dump design kicks off this month
- photon dump size for MFX
- it wil be ~ 1mx 1m
- sensor selection - looking for a SME
- ESD in progress with mechanics specified
- photon dump size for MFX
- ray trace
- benchmark cases in progress
- format question for output
- walk through with RP during next meeting(s)
- KB
- Matt Seaberg - engineering note for KB hardstops
- hardstops; beam size on photon dump with Matt/Alyssa
- chiller check - rack space - under diag1
- check perimeter (for enclosure) - in model
- Status?
- focus range
- ESD documents?
- schedule -