MD ItemProcedure Link

Machine Time

Responsible Party

Required beam destination NotesCompleted
Injector wire commissioning 


TD11Find wires, verify planes 
Compare injector wire emittances to 571 quad scan


TD11, IN10 561 wireSounds like the kind of task that will challenge your faith in our most reliable measurement 
Characterize BC11 Collimators 





Characterize BC14 energy offset 





Stagger L1 chirp

L1-chirp-stagger.txt

(draft)

1-2hBuschmannTD11 initially, S20 after setupwant to characterize effect on longitudinal phase space, emittance growth in L2 and relationship with collimation of beam tails/losses in BC14
S20 Configurator variable waist scans 


2 shifts
Beam to dumpMeasure IPWS1 sizes with fix X and variable Y, and through different waist shifts
YOUR IDEAS HERE