MD Item | Procedure Link | Machine Time | Responsible Party | Required beam destination | Notes | Completed |
---|---|---|---|---|---|---|
Injector wire commissioning | TD11 | Find wires, verify planes | ||||
Compare injector wire emittances to 571 quad scan | TD11, IN10 561 wire | Sounds like the kind of task that will challenge your faith in our most reliable measurement | ||||
Characterize BC11 Collimators | ||||||
Characterize BC14 energy offset | ||||||
Stagger L1 chirp | (draft) | 1-2h | Buschmann | TD11 initially, S20 after setup | want to characterize effect on longitudinal phase space, emittance growth in L2 and relationship with collimation of beam tails/losses in BC14 | |
S20 Configurator variable waist scans | 2 shifts | Beam to dump | Measure IPWS1 sizes with fix X and variable Y, and through different waist shifts | |||
YOUR IDEAS HERE | Curious about something? Propose a study to get data about it! |
...