- Try on CM07-2, CM19-1 and -2 first
- SC recovery scheduled for January 16th, after the weekend after STCAV0 installation is scheduled to finish
Action items
- Lauren Elizabeth Alsberg : check vac valves, magnets for shutdown
- Sebastian C. Aderhold : check vac valves for STCAV0 work