Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Zyla

daq-mec-cam02

daq-mec-cam01

-c 0 -i "MecTargetChamber/0/Zyla/0"USB - fiber optic extender - USB via overhead cable tray dropping into R60.

Operational.

Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4009
.

Alviumdaq-mec-pgp01-s 04MMC -l 400000000

Direct 8m cable from R62, partially via overhead rack.

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.

Operational, and already removed.
Visar1daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.

...