Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Start the safety review and track the safety review progress on the sharepoint site: https://slac.sharepoint.com/sites/facet/facet_public/newnav/Pages/Proposals.aspx 

Safety Review

Overall process is a released document here:

https://slac.sharepoint.com/sites/pub/Publications/080-0020_Test_Facilities_Expt_Review_and_Approval.pdf

Part of the safety review is with Radiation Physics. RP must review and approve all beamline installations. There is a line item in the BAS about having all the experiments approved by RP. The signer is responsible to ensure this remains the case throughout the operation of the beam so if there is a change during an active BAS, that change must be approved prior to being installed to keep the BAS valid.

Past RP memos are located here:

V:\TF\Facet II\Experiment Safety Reviews\Memos to Radiation Physics

Safety reviews also include the TF safety review committee. Material and notes of approval are stored on the V drive here:

V:\TF\Facet II\Experiment Safety Reviews 

And are tracked here:

https://slac.sharepoint.com/sites/facet/facet_public/newnav/Pages/Proposals.aspx 

Performance Reports

The DOE will ask for quarterly reports on how beamtime is spent.

...