Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Excel spreadsheet for the FEL settings is here.


  •  Prepare the hutch for the shift
  •  
  •  15 min before the shift begins, call ACR at x2151 to check:
    •  photon energy
    •  nominal pulse energy
    •  nominal pulse duration
    •  beam mode
    •  e-loss scan needed?
  •