PriorityMD ItemProcedure Link

Machine Time

(shifts)

Responsible

Party

Needed ByPrerequisitesNotesComplete
3Injector setup for 10deg off Schottky zero crossing
3White
TCAV0 operationalMaybe investigate smaller laser spot
3Laser spot size variation



Discussion with Glen...

4Very low bunch charge setup 



Laser spot size variation study

3Linac Ballistic Data
5




3S20 Ballistic Data



Good pencil beam config

S20 Quad BBA, energy feedback



3Individual mechanical<>magnetic offsets in L2

Loney



110-2 peak power 
1

Kalsi, Loney



Move peak power detection from WVG FWD to cavity probe. Follow up with RF and TID to get the Software diagnostics built out.Partial, watch & wait
1S20 BBA
2

Kalsi

2/6/2024


2-4Notch Collimator recommissioning
1+2Loney
Completion of RP Survey and Monitoring Plan parts N and QCurrent energy spread may not be compatible with clean cuts
2S20 matching studies/emittance in S20

S20 Emittance and Matching

1Loney
Good pencil beam config,
S20 Quad BBA,
S20 launch feedback


32nC running/instability investigation
2Loney

FJD interested
1Two-bunch prep/setupTwo-bunch config development8Yocky, Majernik, Buschmann4/2 - 4/3 2024
linked plan is for first ~2 shifts
4

BLEN sensitivities

BLEN Sensitivities MD
Kalsi



2

S20 BLEN



Kalsi



2Investigate orbit dependent matching into L2

Loney
BBA, working steering appFJD notes similar issue in LCLS–likely eta from BC1
1Complete ORM
Loney
Analysis tools 
Done?
2Tuning IP with smaller beta*

Yocky



1Pencil beam configOct 13, 2022
Kalsi



1Flag beam configFeb 2, 2024
Parker



3Learning data for MDL FF / Track hardware issuesOct 6, 2022
Perez, Loney



4RF kicks

Kalsi



4Linac BBA (rechecks)BBA Shift Plan
Loney



3Toroid ringing investigationSep 1, 2022
Kalsi



4Injector RF Standby triggering

Loney



2Automated Steering development

Buschmann, Cesar
good R measurements and ability
to implement those into steering app


2L1 orbit stability studyOct 6, 2022
Parker



2RF stability (jitter, jumps, and djrift)Sep 15, 2022
Ripman



3PCAV 0 commissioning 
2Loney
Thing works 

2TCAV3 commissioning
2

Thing works 

2DC magnet stabilitySep 29, 2022
Parker



2TCAV0 study (sigz v. Sch. phase, etc.)Oct 6, 2022 TCAV0 Shift Plan
Parker


Done?
1Linac wakefield bump tuning exploration

Yocky,Kalsi




Laser heater TTO
1Majernik3/11/24


3

New phase scan GUI

  • linac scans L2, L3
  • injector scans (L0, L1)

~1Buschmann
Stable beam to S20 + TD11GUI ready to test with beam for L2, L3 scans. injector scan code is WIP
3

Stability improvements to IN10 RF


2Cesar2/19/24
Implement in 10-5 first, then L0 stations, lastly 10-2
1 ?

Longitudinal Feedback Debugging

shift plan draft0.5Buschmann
Stable beam to S20Mainly forensic
2

BC14 chicane exploration

shift plan draft0.5 - 1Buschmann
Stable beam to S20


Software development/testing






Standby Machine Development (SMD)

MD ItemProcedure Link

Machine Time

Responsible Party

Required beam destination NotesCompleted
XTCAV Resolution vs IP configFACET dumpCompare different beta*s at nominal IPWS1, DSOTR, and possibly other locations/shifts
Injector wire commissioning 


TD11Find wires, verify planes 
Compare injector wire emittances to 571 quad scan


TD11, IN10 561 wireSounds like the kind of task that will challenge your faith in our most reliable measurement 
Characterize BC11 Collimators 





Characterize BC14 energy offset 





Stagger L1 chirp

L1-chirp-stagger.txt

(draft)

1-2hBuschmannTD11 initially, S20 after setupwant to characterize effect on longitudinal phase space, emittance growth in L2 and relationship with collimation of beam tails/losses in BC14
YOUR IDEAS HERE



Curious about something? Propose a study to get data about it!

Past Completed MD Programs 

MD ItemProcedure Link

Machine Time

(shifts)

Responsible

Party

PrerequisitesResults, notes Completed
S20 BBAOct 13, 20222

Kalsi



x
S20 matching studies/emittance in S20

Sep 29, 2022

<link>

1WhiteGood pencil beam config,
S20 Quad BBA,
S20 launch feedback

x
2nC running/instability investigation
2Loney
FJD interestedx
Pencil beam configOct 13, 2022
Alsberg

x
Learning data for MDL FF / Track hardware issuesOct 6, 2022
Alsberg

?
Linac BBABBA Shift Plan
Loney

x
Toroid ringing investigationSep 1, 2022
Alsberg

?
DC magnet stabilitySep 29, 2022
Parker

x
Linac wakefield bump tuning exploration

Yocky

?
Commissioning Laser Heater 

Yocky*
Laser Heater Commissioning Task Listx
7-hole Cathode Alignment Procedure <1Loney

x
Simple 3nC Setup1-hourLoney, KalsiGood Starting point at current charge configuration
x
SYAG energy calibration



LoneyLow energy spread Average of 54.7 keV/um but lots of variation3/8/2024
DL10 energy minimization vs bunch chargeE-log

Ops

TD11
2/13/24 Unoptimized SOL121
Injector bunch length vs bunch charge



OpsTD11
4/7/2024
S20 beam density measurementsS20 beam density vs chrip
OpsFACET dump

2/5/24 Plot

2/5/24 Data

S20 beam density measurements 2Loney

2/5/2024
XTCAV calibration vs power 


FACET dump
4/20/24 Data
XTCAV Resolution vs IP config

LoneyFACET dumpCompare different beta*s at nominal IPWS1, DSOTR, and possibly other locations/shifts4/20/24


Link to FACET-II Global Planning Airtable 

...