- Run planning: https://docs.google.com/spreadsheets/d/1y8mnxkCVaOs73ekeLUS-UJZJWMsA7eOH/edit?usp=sharing&ouid=103601260766104549989&rtpof=true&sd=true
- Shift reports: http://ad-ops.slac.stanford.edu/facet-shift-report/
- Shift summary report form: http://ad-ops.slac.stanford.edu/facet-shift-report/shift_summary_form/
Procedures
- E-320 focal spot optimization with 1st OAP, YAG target alignment & imaging, electron-laser spatial overlap
https://docs.google.com/document/d/1ggCx77pcXtmoSfgxGfD_MbEW6WvdQ0__8lb9CY_OOjM/edit?usp=sharing
version from the June 2022 downtime access:
https://docs.google.com/document/d/1ObcXum44AmlUi-EVv_y3cAG8wcymhELt4ZJxAfqI9Wk/edit?usp=sharing - FACET beam vector procedure: https://docs.google.com/document/d/1S94E_sG0lsHjCt70gnzeCo6ReKtVgDCiAdlnnkhN10c/edit
- E-320 No-beam Laser Alignment, Alignment target test (attenuated laser) + repeat of high-power beam dump test (full power laser)
https://docs.google.com/document/d/1sBxmYC8zqqaLUJwpkVYCQ3L-C04nBamIJh6C8BZw_Dk/edit?usp=sharing - E-320 Laser Alignment, Alignment target test - attenuated laser alignment + beam
https://docs.google.com/document/d/1ccdD5ti5yLGS0WPEwzYn_dLSlJ-0g6DjCyQwopRfQlo/edit?usp=sharing - E-320 SFQED Assembly Commissioning Shift Plan with laser and e-beam
https://docs.google.com/document/d/1TR6Pyk6s_p5_ibCRqRT1_EGhiL0NP0YRe1T6-oPBaRU/edit?usp=sharing - E300/E320 Check list for full power laser test run to the tunnel V2
https://docs.google.com/document/d/1oKyrm289sxPo8PpCDxToUMMmVZiXFL2tPrE2z2-gPrs/edit?usp=sharing - Old: E-320 IP Assembly Installation Procedure for long downtime (Aug-Oct 2021)
https://docs.google.com/document/d/1t38nrp5qCxdkixntqiXObbj4tVVpptF1c8oPHfHFXVM/edit?usp=sharing
...