Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

List of PVs associated to the vacuum system components

Pumps

...

PV
MEC:MEZ:PMF:01:MPSTART_SWEbara multi-stage pump 1 status (off: Low=0 / on: High=1)
MEC:MEZ:PMF:01:ALMRST_SWEbara multi-stage pump 1 reset button
MEC:MEZ:PMF:02:MPSTART_SWEbara multi-stage pump 2 status (off: Low=0 / on: High=1)
MEC:MEZ:PMF:02:ALMRST_SWEbara multi-stage pump 1 reset button
MEC:PR60:PWR:1:Outlet:2:SetControlActionEdwards scroll pump associated with turbo 2 (on: 1 / off: 2 / reboot: 3)
MEC:TC1:PTM:02:START_SWVarian turbo pump 2 status (off: Low=0 / on: High=1)

Gate-valves



MEC:TC1:VGC:11:OPN_SWTarget chamber venting with compressed dry air (closed: Low=0 / open: High=1)
MEC:TC1:VGC:12:OPN_SWTarget chamber venting with atmospheric air (closed: Low=0 / open: High=1)
MEC:TC1:VGC:12:OPN_SWPrimary vacuum to target chamber ()

...

Pressure gauges