System overview

MEC's pumping system is comprised of 2 multi-stage dry vacuum pumps (Ebara A70) located on the mezzanine above the hutch, and 2 turbo pumps (Varian TV-2KG) backed with a scroll pump (Edwards xds35i). The following sketch shows the vacuum system as displayed in the controls window.

MEC vacuum system when the chamber is ventedImage Added

The dark grey rectangle in the center symbolizes the target chamber and displays the readout values of different vacuum gauges measuring the in-chamber pressure (top: cold-cathode, bottom-left: pirani, right: capacitance). Let's note that the capacitance gauge is out of order and always displays the same faulted value.

The top right side of the window details the primary pump subsystem. The ends of this branch lead to the 2 Ebara pumps. Controllable gate-valves are positioned at the target chamber entrance to isolate the primary pump subsystem, at the inlet of each independent Ebara pump, and along the line to allow for venting of the subsystem. Pirani gauges are also used to monitor the pressure along the subsystem pumping line and at the inlet of both Ebara pumps.

The bottom side of the window details the secondary pump subsystem. It comprises 3 branches: 2 of them are identical and symmetric on the sketch, and 1 of them (left-most), the shortest with only 3 symbols, is obsolete 

Tools necessary to the pumping procedure


Primary vacuum


Secondary vacuum


Venting