Start up procedures:
general prep
- if you're not hooking the cart up to another chamber, no prep needed.
-
- if you are hooking the cart up to another chamber:
1. Bring Bring an N2 cylinder, clean regulator, and clean hose.
2. With no pumps running
3. Attach that to the cart.
2. begin venting the cart with the N2
begin venting the cart with the N2
Attach N2 hose to cart vent assembly (insert pic).
open nitrogen source's valve enough to hear the cart's pressure relief valve gently hissing.
open the cart's vent valve
open any valves between the vent valve and the hose
43. remove the blank at the end of the hose
45. Attach the cart to the to-be-qualified chamber, but do not(!) valve in open the valve between chamber and hose.
valve in to the other chamber only after qualifying the cart itself first with Peter Stefan.
- if you're not hooking the cart up to anything: no prep needed
Cart specifics (assumes you've done the prep listed above)
Carts 1 & 2
Cart startup procedure:
Be aware CAUTION: plugging the cart in to an electrical socket will instantly immediately start up the roughing pump.
...
Carts 6 & 7
doesn't exist... yet.
Shut down
General
Trouble Shooting:
general:
roughing pump
valves
carts 1 & 2:
Turbo:
...