Start up procedures:

general prep

    • if you're not hooking the cart up to another chamber, no prep needed.
  •  
    • if you are hooking the cart up to another chamber

1.  Bring Bring an N2 cylinder, clean regulator, and clean hose.

2. With no pumps running

3. Attach that to the cart.

2. begin venting the cart with the N2

begin venting the cart with the N2

Attach N2 hose to cart vent assembly (insert pic).

open nitrogen source's valve enough to hear the cart's pressure relief valve gently hissing.

open the cart's vent valve

open any valves between the vent valve and the hose

43. remove the blank at the end of the hose

45. Attach the cart to the to-be-qualified chamber, but do not(!) valve in open the valve between chamber and hose.

valve in to the other chamber only after qualifying the cart itself first with Peter Stefan.

    • if you're not hooking the cart up to anything: no prep needed

Cart specifics (assumes you've done the prep listed above)

Carts 1 & 2

Cart startup procedure:

Be aware CAUTION: plugging the cart in to an electrical socket will instantly immediately start up the roughing pump. 

...

Carts 6 & 7

doesn't exist... yet.


Shut down

General


Trouble Shooting:

general:

roughing pump

valves

carts 1 & 2:

Turbo:

...