Load the configuration for the system configuration (back end: ATCA (advanced telecommunication computing architecture) and front end (FEB+Hybrid+APVs)) . Click on the HpsSvtDaqRoot tab and load settings
No Format |
---|
/u1/hps/daq/heavy-photon-daq/software/config/rce-test.yml |
There is a copy of this configuration file in /u1/hps/server/heavy-photon-daq/software/config/
In Variables tab navigate to the FebArray→FebCore→FebConfig and HybridPwrEn the 0 and 1 (the power supply might not be able to sustain 3 hybrids, but should be OK for 2)
Navigate to "Commands" tab and in PcieTiDtmArray click the sequence:
1) ApvClkAlign (to set all the APVs to the same phase)
2) ApvReset101. (reset and start to wait for a trigger signal)
Configuration files used to configure rogue.
The 2019 CODA (central DAQ software at jLab) configuration files for HPS DAQ are stored on jLab machines at
...