  • SLAC Rd53a device 0x0A97 (25x100 pixel 150um active thickness) replaces the current channel D 0x0A57 (50x50) early enough in the morning to allow Timon tuning it remotely 
  • SLAC RD53a readout tests with TLU 
  • Setup a cleaned up TTL beam trigger from Ch-11 for cosmic telescope to see if the double timing peaks still exist.
  • Main data taking runs will be steep tilted 25x100 sensors. One DUT at a time, first 0x0A54 (100um LBNL) then 0x0A97 (150um SLAC). 

10:30 Replaced 0x0A58(labelled A57 in the configs) with SLAC RD53A device 0x0A97.

11: 12 Beam was up and started taking runs, but no events were being built, called Timon and he said module A54 does not like to be power cycled. So we requested access to go down and fix it.

11:47 Beam was turned back on after module started working again and Run 541 was started with just one Yarr producer in the run control for the LBL RD53A A54 module. Timon is working on tuning the SLAC device to get it up and taking data.

11:55 Lost beam for a couple of minutes but it came back up when Carsten called.

 

 

RunStartEnd time#eventsRD53a DUTParticle rateComments
54111:48  C Lost beam for a couple minutes at beginning of run.