We took a cable at tunnel end labelled with a yellow tag "2" and tagged as "Sun server" which is connected via Belden Belgen patch panel channel 19 that emerged on central rack side connecting to the switch port 34 on the ESA-RESTRCTED side. This worked pretty easily to get on network but installing more software in situ was a real pain.    

...

  2:00  Beam coming through and we are running EUDAQ 1.7 (/opt/install/eudaq/eudaq-1.7/) ! with Caladium only. The beam is low in Y (Caladium is too high in Y). This confirms that the initial laser position aiming several mm below the beam pipe exit cross wire was actually deliberate and correct and telescope should not be adjusted up. Ke retuned the telescope Y position to recenter the beam spot. Took two runs 7,8 with high stat as beam spot position reference. Online monitoring histograms from Run 8 (default location of online hist save is /opt/install/eudaq/eudaq-1.7/bin) copied to /home/tfuser/Desktop/2018June_onlinemon/ which may be the combined Run 7 and Run 8 and the online monitoring histograms are by default accumulative across runs until manually reset

  3:00  UCSC prompt offline analysis package broken with the new V1.7. We have no other know working build for the new data.    

  3:15  Access for HGTD to turn on HV.

  3:30  While RD53 DAQ preparation and tuning calibration in progress, the Run program is primarily HGTD tests for the time being, while whenever RD53A is ready for beam we should switch to that immediately.  

  5:00  The setup of TLUProducer running on YARR clearly cannot be the standard solution for all future Caladium runs as the YARR computer is returning to LBNL at the end this period. Ben/Cesar/SD started to look into migrating the TLUProducer onto the Sun server at esadutdaq1 which is a regular part of the Caladium setup. The server needed a push of a front power button to fully power up (otherwise showing main power off). An extra (white) Ethernet cable is added from the Sun server (top socket #1 of the two Eth sockets near rack edge) to the Belgen patch panel channel 8 which is connected to switch port 37 on the ESA-RESTRICTED network. The node came up correctly as esadutdaq1 with IP 172.27.104.45. It has a fairly modern SLC6 operating system. However, the login is always a bit slow due to SLC6 (a CERN product) with a default habit of checking network info at CERN first... 

  7:00 HGTD datataking continues with requests to MCC for different intensities. The operation had made breaks when LCLS is changing beam energy which typically have sigificant effect on the ESTB particle rate and beam spot can shift by a few mm. MCC typically need to call us for beam energy change and getting the new setup to stablize then call us to take new runs.   

  9:00 HGTD daatataking done for the day.

  9:50 MCC called and they had trouble to reestablishing beam after shift change. Toni Smith is called in.

10:17 MCC called with beam reestablished. Primary beam E=11.48, ABend Dipole=11.21 GeV. Beam Q=0.25 nC. Beam spot appeared to be off center in X by ~5mm and in Y by ~2mm. Adjusted telescope to center.

 10:53 Started the final run of tonight Run 25 for beam spot characterization. 30 hit clusters per plane per event (65 hit pixels/plane for clean planes).        

Jun/2

Plan:

Operations resume at 9am. Timon is building an RD53A DAQ build overnight, aiming for an RD53A run in the morning. Depending on the outcome, we will have different mix of RD53A runs and HGTD runs. Some special tasks besides the main datataking:

  • Can we establish a working prompt offline analysis build to work with the new V1.7 data ?  
  • TLUProducer migration from YARR to Sun server esadutdaq1
  • Is there a clever way to serve our online histograms to MCC ?
  • Try to get RCEProducer integrated into V1.7 ?