Caladium and electronics rack are lifted off the ESTB tunnel and placed on ESA floor just behind the orange network racks for continuing EUDAQ software update tests. Yubo and SD reconnected the Caladium and managed to start Run at some point with ni_autortrig mode which was seeing "particle" (auto trigger) counters going up but no actual trigger or event build. After that, even NI_MIMOSA process would get stuck in config. Ben's 1.7 release build was successful with the exception of the online monitoring which required ROOT6 while building ROOT6 apparently requires the node with full internet access which ar-eudaq does not. We still have easy ESA access for 1-2 days until the next experiment starts.  

 

May/23

Retested Caladium auto trigger run without touching the hardware. This time it just worked all the way through. Not clear what made the difference. Just he cold start of MIMOSA DAQ ?