InstitutionNames
ANLVallary Bhopatkar
IHEPYubo Han
LBNLAlexandra DimitrieskaAleksandra Dimitrievska, Maurice Garcia-Sciveres, Timon Heim, Charilou Labitan, Ben Nachman, Cesar Gonzalez Renteria, Mark Standke
LouisvilleSwagato Banerjee
SLACNicole Hartman, Ke Li, Jannicke Pearkes, Murtaza Safdari, Su Dong
UCSCZach Galloway, Carolyn Gee, Simone Mazza, Jason Nielsen, Yuzhan Zhao

...

Run NumberStart timeEnd timeNumber of EventsWindow coordinates (DUT)Comments
142

03/06/18

18:24

03/06/18

18:28

0 No events seen with RD53A, and few event correlations (<10 for MIMOSA 1 &2) between MIMOSA planes.
143

03/06/18

18:31

03/06/18

18:57

  

Before Run: Terminated and restarted EUDAQ Run Control.

Now seeing events with RD53A and more event correlations for MIMOSA. Only hitting diff FE; moving RD53A. Did not save root file.

144-145

03/06/18

18:58

03/06/18

19:48

  

Still moving RD53A.

Asked Control Room to change rate from [First Mode 5Hz] . Increased rate by opening the collimators. Decreased rate right after @ 19:49.

146

03/06/18

19:53

03/06/18

20:27

9917 

Y Fine: RBV from step: 16.00mm.

X Fine: RBV from step: -25.00mm.

EUDAQ online monitors saved.

147

03/06/18

20:28

03/06/18

21:01

9982 no changes
148

03/06/18

21:02

03/06/18

21:38

9991 

no changes

See monitoring plots showing correlations between RD53A and Mimosa26 2.

21:00 Jason Nielsen & Murtaza Safdari on shift.  Aleksandra stays to monitor data-taking and supervise rotation of the RD53A module.

21:48 The most recent run, 148, shows nice correlation between the RD53A and Mimosa hit locations.

...

RunStart TimeEnd TimeNumber of EventsWindow Coordinates (DUT)NotesMounting Orientation

Rotation

(angle of sensor normal to beam)

149

03/06/18

22:24

03/06/18

22:36

~3000no changevery low hit rate in RD53A, perhaps due to remnant configuration from calibration scancolumns running up & down0
150

03/06/18

22:38

03/06/18

23:11

9997no changeafter stopping DAQ and restarting through init and configureno changeno change
151

03/06/18

23:12

 

03/06/18

23:46

9981 no changeHit rates seem about 10% lower than in previous run.  Reason unknown.no changeno change
152

03/06/18

23:48

04/06/18

00:01

5021Rotation: from 78.17 to 153.13.used for rotation of the chipno change75 degrees

We confirmed that the cluster size is roughly 7-8 pixels in this last run.

Image AddedImage Added

 

00:01 Beam is off for calibration

00:10 Beam is back on.

After we saw a very weak correlation between RD53A and Mimosas in the previous run, we decided to pass through the configure step before starting the next run.  It may be a good idea to do this before each run, just to be safe.

RunStart TimeEnd TimeNumber of EventsWindow Coordinates (DUT)NotesMounting Orientation

Rotation

(angle of sensor normal to beam)

153

04/06/18

00:18

04/06/18

00:51

9992unchanged unchangedstill 75 degrees
154

04/06/18

00:52

   problems getting through config  
155

04/06/18

00:57

04/06/18

01:11

3392unchangedbad run, beam status was changing, and rate was lowunchangedstill 75 degrees

00:58 Control Room called to let us know that they will be going up a couple of GeV in energy.  This may cause increased rate for us.

156

04/06/18

01:13

04/06/18

01:46

9991unchangedthis lower rate seems very good for usunchangedstill 75 degrees
157

04/06/18

01:47

04/06/18

01:58

3237unchangedDid not pass through Config before Start. No correlation between RD53A and Mimosas.unchangedstill 75 degrees
158

04/06/18

01:59

04/06/18

02:33

9995unchangedPassed through Config before Startunchangedstill 75 degrees
159

04/06/18

02:34

04/06/18

03:07

9687unchangedPassed through Config before Startunchangedstill 75 degrees

2:55 Early morning crew arrived (Vallary, Carolyn)

03:07 Control Room called to let us know that the energy will be increased again for the primary, starting in 10 minutes.

160

04/06/18

03:08

04/06/18

03:13

866unchangedunstable beam to ESAunchangedstill 75 degrees
161

04/06/18

03:15

04/06/18

03:48

9969unchangedstable beam (primary beam E 13.26GeV)unchangedstill 75 degrees
162

04/06/18

3:52

04/06/18

04:24

9991unchanged unchangedstill 75 degrees
163    

When started new run all producer and data collector state changed to dead.

Error message on the YARREudaqProducer: terminate called after throwing an instance of 'eudaq::Exception'
  what():  Error sending data:
  From /local/pixel/YarrEudaqProducer/EUDAQ/src/EUDAQ/main/lib/src/TransportTCP.cc:229
  In void eudaq::{anonymous}::do_send_data(SOCKET, const unsigned char*, size_t)
Aborted (core dumped)

Kill the eudaq run control and started again

  
164

04/06/18

04:33

04/06/18

05:07

9998unchangedThis is the run after crash and it doesn't show the correlation between the telescope planes and RD53 moduleunchangedstill 75 degrees
165

04/06/18

05:09

04/06/18

05:43

9993unchangedCorrelation plots look goodunchangedstill 75 degrees

05:44 Control Room called to let us know that the energy will be increased again for the primary. Will start the new run once beam is stable.

166

04/06/18

05:52

04/06/18

05:59

2076unchanged

 Primary beam E 14.08GeV                                   

control room called to let us know that the beam will be off for few minutes for gas detector calibration

unchangedstill 75 degrees
167

04/06/18

06:03

04/06/18

06:37
9998unchanged unchangedstill 75 degrees
168

04/06/18

06:39

04/06/18

06:50

3910unchangedcontrol room called as they are changing the beam energy for primary experiment. No beam for few minutesunchangedstill 75 degrees
169

04/06/18

06:59

04/06/18

07:35

9988unchanged

Primary beam E 12.4GeV

Toni from control room called to inform that they are calibrating their gas detectors so turning off the beam for minute. Beam condition is unchanged so didn't stopped the run

unchangedstill 75 degrees
170

04/06/18

07:36

04/06/18

08:08

9997unchanged unchangedstill 75 degrees
171

04/06/18

08:11

   DAQ crashed  
172

04/06/18

08:15

04/06/18

08:48

9978unchangedThis is the run after crash and it doesn't show the correlation between the telescope planes and RD53 moduleunchangedstill 75 degrees
173

04/06/18

08:50

04/06/18

09:25

9944unchangedcorrelation plots look goodunchangedstill 75 degrees
174

04/06/18

09:28

04/06/18

 

~1500Rotate: 153.13 to 159.13used for rotationunchanged81 degrees
175

04/06/18

09:40

04/06/18

10:05

6075unchangedall good, we had to stop the run because the beam is downunchanged81

10:05 Control Room called to let us know that the beam is down, they are changing the energy. Restart when the beam is back.

10:32 Beam is back, beam position changed a bit

176

04/06/18

10:33

04/06/18

11:06

9993unchangedgood, beam focused to the diff FEunchanged81
177

04/06/18

11:07

04/06/18

11:10

910X fine: -25.00 mm to -24.00adjusting horizontally to the new beam positionunchanged

81

178

04/06/18

11:12

04/06/18

11:45

9947unchangedgood, beam focused on lin and diff FEunchanged81
179

04/06/18

11:46

04/06/18

12:13

7308X fine: -24.00 mm to -23.00goodunchanged81

12:13 Beam lost, should be back in 30 minutes

12:59 Beam is back, rate to high

180

04/06/18

12:59

04/06/18

13:06

2251unchangedbeam rate too high (almost 3 times higher), called control room to reduce itunchanged81
181

04/06/18

13:06

04/06/18

13:45

9904unchangedgoodunchanged81
182

04/06/18

13:53

04/06/18

14:28

 

9815Rotation: 159.13 to 150.07

good, rotation done before the start of the run

DAQ restarted after the end of the run!

unchanged70
183

04/06/18

14:30

04/06/18

15:04

9930unchangedgood, with correlationsunchanged70

15:15 Requested access to make reference for the angle of the chip. Please take a screenshot after changing position!

16:07 Beam is back on

184

04/06/18

16:17

04/06/18

16:17

0Rotation: 150.07 to 161.24restarted DAQunchangedto calculate
185

04/06/18

16:20

04/06/18

15:04

9973unchangedgoodunchanged161.24
186

04/06/18

17:11

04/06/18

17:45

9976unchangedgoodunchangedsame

17:34 Plan:

  • take two runs for each position of the chip
    • 150
    • 140
    • 130
    • 120
    • 115
    • 110
    • 105
    • 100
    • 95
    • 90
  • take a snapshot for each position, save the picture on the desktop, note the name of the picture in the table
  • note the position of the motor in the table
  • when reached perpendicular to the beam take the data for the end of the beam
  • when the beam is off (and all angles are covered) notify Ben/Timon so we can tune the chip to a different threshold and wait for futher instructions
  • before each start of the run, load the config files
  • restart the DAQ system
  • check the correlation plots Telescope - RD53a

18:00 Ke and SD on shift

18:20 Adjusted DUT rotation to RBV=151.24 (step -10). Rotation stage stuttered a bit but got there eventually.  

18:30 Runs 187-189 had some suspiciously low rate of DUT hits, online mon crash because hitting reset during start. Finally got Run 190 going with reconfig.

18:35 Run summary info now recorded in Google Doc Run List directly. 

19:30 Noticing the mean hit rate per event rather low seems to be due to beam going on and off. So the total number of events may not be a reliable number to use for the actual track statistics.

19:41 Run 191 reached 10000 events but very low entries in correlation plots so we just let the Run roll over to 192 without saving/reseting monitoring histograms.

20:15 Run 192 reached max events then rolled over to 193 which we stopped after small number of events to conclude this measurements for this angle, with combined mon histograms from Run 191-193 saves as run193.root. DUT rotation -10 RBV=141.24. 

20:30 We did a simple calculation from the DUT X vs MIMOSA26_2 X correlation plot from the previous angle's Run190.root histo which showed a slope of (50um/18.4um)*dX(DUT)/dx(MIMOSA)=1/sin(theta) which implied 180-theta=155.3 degrees, which is not far off from RBV=151.24 which is supposedly quite close to the actual angle in degrees. This method is also immune to small telescope tilt which cancels in the slope. The X correlation should be also mostly independent of the active Si depth knowledge. The cluster sized based estimate from  tan(theta)=150um/(Cluster-size) gave 150 degrees while the cluster size measurement is somewhat less precise and needs to be sure of the 150um Si depth.

21:22 Run 195 looks like has lost the DUT vs MIMOSA correlation. Stopped run, terminated Run Control and restarted everything for Run 196.

21:40 Run 196 still showing only very faint DUT correlation so we stopped it to reconfig, but looked like we lost beam upon the start of Run 197 so we stopped that short run also. 

21:45 Beam back. Started Run 198 and correlations looked much more healthy. 

21:50 Primary beam energy went up to 12.48 briefly and then back to 12.12 GeV. Starting a new run for HGTD anyway. 

22:18 Stopped Run 198 to change DUT rotation angle to 130 deg. DUT rotation -10 RBV=131.24. Reconfigured twice to be sure to start Run 199. Correlations look good.

22:23 Noticed that each time we rotate and correlated hit region of DUT keeps on marching to higher X and the top edge is getting closer to the right edge. Since the top tip of the correlation diagonal line is running behind the histogram stat box, we tried to move the display stat box but that crashed the online Mon. Had to restart everything for new Run 200. 

23:00 After the end of Run 200, we moved the DUT by -2.5mm (towards ESA gate - camera confirmed) to get away from the +x edge.

23:02 Started Run 201.  X correlation moved left by the desired amount as expected.

23:14 The DUT correlation looked rather faint/low stat. Ending Run 201 early to reconfigure.

23:15 Started new Run 215 after double reconfig. Correlations looked better.

23:42 MCC called to change primary beam energy to 12.40 GeV. Ending Run 202.

23:45 Rotated DUT -10 to RBV=121.24.

23:46 Started Run 203, but noticed no beam, so stopped it with 0 event. 

0:39 Moved DUT dx=-2mm to avoid +x edge

0:39 Run 207 started. Seemed to have more background hits and correlation faint. Ending Run to reconfig.

0:53 Started Run 208. Rate and correlation looked better.

1:30 Rotated DUT -5 RBV=116.24.

1:32 Started Run 209.  

2:00 Yubo and Jannicke are on shift

2:19 Stopped Run 210 because of faint correlation plots, reconfigured

2:20 Start Run 211 correlation looks better now

7:45 Run 222 Rate went funny in online monitor (down from 5.1 (4.97) Hz to 4.8 (inf) Hz. Stopped the run (also on HGTD). On restart Yarr producer dead. After restarting Yarr producer, Data collector dead. 

8:07 After terminating in eudaq Run Control and restarting, we are up and running again! Restarted HGTD as well. 

8:55 Run 227 at hard rotation limit (RBV from step: 98.71), not pushing further to 95, but instead taking data at 98.71.

10:04 Ended Run 228 to access so that we can get around the rotation hard limit to reach 0 degree setting. Simone replaced HGTD sensors with 3-pack in front of 4th plane while removed the one behind that plane. Timon doing calibrations to get a low threshold tune.

10:30 While one can turn the rotation stage knob to make it pass the 0 degree point. The behavior of the software control limit is mysterious. We settled to a position that is 0 degree with the best we can do by measuring distance from 3rd MIMOSA plane to the DUT support frame to be equal on both left and right sides with within 1mm. This doesn't set the sensor angle to beam exactly to zero but makes the DUT parallel to MIMOSA plane. Rotation (new scale) RBV=146.51 for this 0 deg setting. Unfortunately, we can only increase RBV by remote control from this point and it cannot go back. We also took measurements of the plane positions while there.    

11:40 moved -4mm in x to center diff FE more in beam. Stopped run and started new one. Only diff FE is enabled with new 800e threshold cal.

11:50 were not seeing correlations with Mimosa 26-2 either in x or y. So decided to stop run, configure twice, and start new run. Forgot to save monitoring plots (the ones showing no correlation). Now in new run we can see correlations.

12:24 stopped run just shy of 9800 events. Just over 1000 hits in diff FE recorded. Started new run, same angle (0)

12:37 for final run plan to rotate in such a way as to match the angle seen in file RD53_Rotation_131_25_dx2p5.png. Want to allow for a 45 minute run + 10 minute rotation and verification of hit rate. Therefore must stop this tun at 13:05 even if it has not reached 10k events yet.

12:50 looks like we lost the correlation at some point. Correlation plots looked bad. Stopped run, configured twice, and started new one. Still at 0 angle

13:05 stopped run. Rotated (file:RD53_Rotation_188_51_new-scale.png). Started a run to see hits. Then moved +4mm in x to get better illumination (saved new image). Noticed no correlation. Stopped, configured twice, and started new run.

13:16 no correlation seen. Stopped run (forgot to same mon. plots). configured. started new one.Looks good. But I don't like this angle (45 deg.) Clusters are too short (size 3). Will take stop at 13:30 and take one more angle (high).

13:29 stopped run. Rotated to very shallow angle (RD53_Rotation_213_51_new-scale-moved-in-x.png). Started new run. Cluster size is now 7.

13:41 correlation seems lost. Stopping, configuring, starting new run.

14:02 14:00 has come and gone and MCR has not called yet. Beam is still going. Keep running

14:08 the beam is gone. Stopped run. Going into access. The end.

Post Beam Session Upgrades

Two main goals: 

  • Find a more permanent host machine for the TPUProducer (which was running on the YARR DUT machine temporarily during May-Jun beam session). The TLUProducer used to run on the NI Windows system, but the difficulties in building Windows applications during the upgrade process to EUDAQ 1.7 led to the conclusion that it is better to host TLUProducer on a Linux node with easier build framework.   
  • Bring RCEproducer forward to be compatible with EUDAQ 1.7 for FE-I4 devices

The Sun server for DUT readout is retired and removed from ESA. A new Kingdel fanless PC box running Centos 7 is setup by Matthias and moved into the Caladium rack to replace the old Sun server and also assumed the role of the host for the TLUProducer which communicates with the TLU through a local USB link in the rack. The new Kingdel box retained esadutdaq1 node name and the IP address of 172.27.104.45 on the ESA_RESTRICTED network. 

The test associated with this was plagued by events not built errors when FE-I4 DUT were added to the DAQ. This was traced (Sep/11) to the missing ground connection between HSIO2 and TLU. The CAT6 cable cage between TLU DUT port and HSIO2 RTM was insufficient. HSIO2 RTM design consciously grounded the RJ45 cage to the cable cage contact, but the TLU DUT port probably didn't. So the kluge of a LEMO cable between any of the socket in the HSIO2 main board LEMO bank and the TLU DUT trigger LEMO port (e.g. the TTL trig0) is necessary to establish the DC reference level between HSIO2 and TLU.