Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Include Bad SVT channels (Next pass)
  • track parameters for detached vertexes (patched, but still needs rigorous solution)
  • check all calibration are good (done)
  • skim steering files are should be finalized (done)
  • Time dependent ECal gains (Next pass)
  • Check the SVT bias and positions flags before recon, and don't recon, if FLags are down (done)

Change to Java8

Recon with Java 8 is faster, instead of 15 hours, now recon is don done in about 11 hours, so we will use Java8 instead of java7

askink asking 2.4 Gb RAm GB RAM from Auger instead of 4 GbGB, didn't cause any prblemproblem, for future we will use 2.4Gb 4GB RAM, and 1.4Gb heap size4GB heap size

Where's the target?

Please see these slides. There seems to be some agreement between FEE, Møllers and V0s for a target position at ~ -1mm.

I would be OK with leaving it at z=0 for this pass.

 

Issues

  •  Failed partitions: Several partitions timed out during reconstruction
  •  Memory Leak: There appears to be a memory leak in our current reconstruction. Solving this would presumable allow us to run our jobs on a larger number of machines at JLab without requiring the large memory footprint we now do.

...