...
- beam simulation == “beam-tri”
- auger xml: /u/group/hps/production/mc/EngRun2015Scripts/slic/beam-tri_100.xml
- run with ./runjob_100.sh slic/beam-tri_100.xml 1pt05 <firstjob> <lastjob>
- this submits 100 jobs, combining beam, tri, and hadron events into beam “bunches”, 1 per event
- enhanced tridents == “tritrig”
- auger xml: /u/group/hps/production/mc/EngRun2015Scripts/slic/tritrig.xml
- run with ./runjob.sh slic/tritrig.xml 1pt05 <firstjob> <lastjob>
- runs slic over the tridents, 1 trident-per-event
- signal events == “ap-truth”
- auger xml: /u/group/hps/production/mc/EngRun2015Scripts/slic/aptruth.xml
- run with ./runjob.sh slic/aptruth.xml 1pt05 <firstjob> <lastjob>
- runs slic over signal events, 1 signal event-per-event
Readout Simulation
Simulation of the SVT and ECal digital readout is performed by using the HPShps-Java java framework.
- beam background readout == "beam-tri"
- auger xml: /u/group/hps/production/mc/EngRun2015Scripts/readout/ beam-tri_<trigger>_100to1.xml
- <trigger> can be 'singles' (event occurs for each ECal cluster passing the cuts -> more events) or 'pairs' (2 clusters on opposite sides pass the cuts within a time window -> fewer events)
- run with ./runjob_100to1.sh readout/beam-tri_pairs1_1_5mm_100to1.xml 1pt05 <firstjob> <lastjob>
- this submits 1 job, combing the simulated readout of 100 files from the previous stage into 1 output file
- enhanced tridents with beam background== “tritrig-beam-tri”