Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Event type #NameNotes
17Pre StartIndicates the "pre-start" transition in the DAQ
18GoIndicates the user pressed "Go" on DAQ
19PauseIndicates the user pressed "Pause" on DAQ
20EndEnd of run marker event.
31EpicsEpics event - Slow controls data that is injected into the data stream.
Bit 7PhysicsPhysics events should have bit 7 set
Bit 6SyncSync events (containing scalers and trigger config) should have bit 6 set.
This was not working properly before 2015_03_24 (Note: The 1st event in the run will be a sync event, but does not always have the sync bit set.)
Bit 5PulserThe pulser triggered the event.
Bit 4LED/CosmicLED or Cosmic trigger.
Bit 3Pairs 1Indicates a Pair1 trigger.
Bit 2Pairs 0Indicates a Pair0 trigger.
Bit 1Single 1Indicates a Single1 trigger.
Bit 0Single 0Indicates a Single0 trigger.

 

EVIO Banks - 2015 Data Set

Below is a list of the banks and tags used in the 2015 Engineering Run for HPS. Note that the bank numbers and tags used are chosen by the DAQ configuration, and are thus subject to change. 

banktagtag hexNameNotes
 57621 0xe115 Scalers Scaler banks
    
    

 

Resources