Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
...
!!! Remember to make sure the interlocks are in the state you want them. !!!
1/14/2013
Removing FEB cooling plate from SVT box to rework FEBs.
System status (from Ben's email Jan 7th):
We can currently power 8 FEBS. We can power every hybrid attached to those 8 FEBS: 30 Hybrids. All Hybrids that we can power are able to sync, except for FEB 8, Hybrid 2, which has just 1 APV that won’t sync.
Link to excel file.
L1t (which was DAQ FEB #0 and GUI FEB #0) has what looks like a short on the output side of the regulator on DVDD (we can’t see the short probing the pins from outside).
L6b (which was DAQ FEB #5 and GUI FEB #7) first appeared to have a short on DVDD. After 5mins and a power cycle it came back with current levels that looked reasonable except that the DVDD level indicated it had no control link.
11:00AM
Removing FEB cooling plate from SVT box to rework FEBs.
see Group C interlock board for instructions on monitoring and controls.
...