Front End Board Testing on Support Plate

Excerpt
protection rework N  res1?Except ADC counts.  The edge channel noise is ranging from ~53 - 55    The ripple is still .  Overall, accross that Y res1YESY res1?  looked very strange for the last run were . Let's rerun in order to check if the problem persist? Y res1YESY res1, res2YESY res1, res2NOseeems  I'll need to look at the data a bit closer tonight but for now, we can move on.Y res1YES   Y res1YES The shifts in the are likely being caused by the fact that I'm using RMS for noise instead of fitting the distribution.

FEB ID

Diode & Protection Res. Rework

Tested
w/ 4hybrids
old plate 4 Hybrids
FEB on Support Plate 

Cleaned

Ready to be loaded on production platefor Loading on Final FEB Support Plate

Comment

1

?Yes12/10/2014 

 

 2A link to the FEB couldn't be established.
2No---FEB mezzanine Amtech connector has been replaced but the board does not have any rework done.
3No---Back from amtech?Waiting to be reworked. Initial test have shown that only 19/20 APV's can be synced.
4No?

12/10/14

 results

-?-

Waiting to be reworked. Initial test have shown that, except for the edge channels, the noise on FEB CH 0-2 ranges from ~47-50

ADC counts.

This is consistent with previous observations so these channels seem fine.

There is a ripple in the noise present on FEB CH 03

and the noise

across the whole hybrid is ~10 ADC counts higher than the rest of the channels.

3N---Waiting to be reworked.
4N---Waiting to be reworked.
5Yes5

12/11/14

results

12/11/14YesIt looks fine.
6Yes

12/11/14

results

-NoThe baseline and noise of FEB CH 00 has issues.  Most of the events had a baseline at ~6150 ADC counts and the noise was ~900 ADC counts. The behavior worsened in subsequent runs.
7No   Waiting to be reworked.
8Yes

12/11/14

results

12/11/14YesThis board looks fine.
9?    
10Yes

12/11/14

results 1, results 2

12/11/14YesAfter power cycling? everything looks fine now.
11Yes

12/10/14

results 1, results 2

 NoAgain, overall the noise looks fine (~50 ADC counts) but there seems to be some samples that still have a large shift in the noise. Looking at the baseline distribution, there seems to be some large tails so that's probably the problem (ADC sampling point is off?).
12Yes

12/11/14

results

12/11/14YesThe baseline, once again, has tails but overall the noise looks fine on all FEB channels.  The baseline and noise on FEB CH 1 and 3 have features similar to what we saw yesterday -- first sample noise is shifted by ~5-10 ADC counts. All other samples look fine.
13?Yes12/10/14  A link to the FEB couldn't be established. Board 13 has some known issues on its D1.0V rail
14?   Yes

12/10/14

results

12/11/14YesLooks fine.
15Yes

12/10/14

results

12/11/14YesBaseline has tails and the shifts in the noise are present on the same APV's as before (on CH 1) but otherwise it looks fine. 

 

 

 

 

 

 

 

...

Front End Board Map

Excerpt

FEB ID

Device DNAFd Serial

Loaded

Tested

ResultsStatusMounted on FEB cold plateServicing hybrids/layer

Notes

1

0x14084072beb01c000xdb000015df877001

09/2014

10/XX/2014 (OM)

 OKYes 

 

2  09/2014  BADNo 
  • 10/02/2014: DVDD is flaky. Seems like FPGA is unable to completely power up.
  • Missing pin found on the terminal side of the FEB
30x74d04072beb01c000x42000015df80ca0109/201410/XX/2014 (OM) OKYes 
  • 10/28/2014: Broken pin found on the terminal side of HV connector. The pin is redundant so the HV should be unaffected.
40x70d04072beb01c000x53000015dfa68a0109/201410/XX/2014 (OM) OKNo  
50x58d04072beb014000x4d000015df9e210109/2014

10/XX/2014

(OM)

 OKYes  
6  09/2014  ?   
7         
8         
9         