Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • 2014-05-15 CSPAD DS1 Alignment - refurbished DS1 camera, optically re-measured quad 2.
    2014-06-05  alignment of quads using lysozyme image from cxid2714 run 23.
    Local: ~/reg/neh/home1/dubrovin/LCLS/CSPadAlignment-v01/calib-cxi-ds1-2014-05-15/calib/CsPad::CalibV1/CxiDs1.0:Cspad.0/*/0-end.data
    (tick) Deployed: /reg/d/psdm/cxi/cxid6214/calib/CsPad::CalibV1/CxiDs1.0:Cspad.0/*/0-end.data or 1-end.data

  • 2014-05-15 CSPAD DS2 Alignment - all quads remeasured, Z information is missing
    Local: ~/reg/neh/home1/dubrovin/LCLS/CSPadAlignment-v01/calib-cxi-dsd-2014-05-15/calib/CsPad::CalibV1/CxiDsd.0:Cspad.0/*/0-end.data

...