Run | Time | Type | Flange board orientation | B-field flange board (Gauss) | B-field FEB (T) | Online display | High-speed ok | Notes |
---|---|---|---|---|---|---|---|---|
baseline1 | 10:43 | Dry run | 2 | 0 | 0 | baseline1.png | Y | Stable condition, AVDD and V125 are stable (<10mA). Noise looks pretty flat throughout hybrid but with the scale it's not obvious. Need detailed calibration plots. What are the noisy channels at the extremes (~200ADC)? |
baseline2 | 11:01 | flange board scan | 2 | 172 | 0 | baseline2.png | Y | No effect visible. |
baseline3 | 11:06 | flange board scan | 2 | 200,300,400 | 0 | Y | No effect visible. | |
baseline4 | 11:10 | flange board scan | 2 | 300, 500,600 | 0 | baseline4.png | Y | No effect visible. |
baseline5 | 11:16 | flange board scan | 2 | 450, 680, 900 | 0 | baseline5.png | Y | No effect visible. |
baseline6 | 11:21 | flange board scan | 1 | 900 across board | 0 | baseline6.png | Y | No effect visible. |
baseline7 | 11:25 | flange board scan | 1 | 1200 across board | 0 | baseline7.png | Y | No effect visible. |
Move FEB into magnet bore. Keep flange board at known working distance from above scan. | ||||||||
|
| |||||||
baseline8 | 11:44 | FEB scan | 2 | 0 | 0.3 | baseline8.png | N | After moving into the magnet the AVDD and V125 started to be unstable. Varies within 100mA. Not sure this happened before or after the field was turned up. |
baseline9 | 11:51 | FEB scan | 2 | 0 | 0.3 | baseline9.png | Y | Rebooted rxTest board, looks ok now. Same as above regarding noise and stability of currents. |
baseline10 | 11:55 | FEB scan | 2 | 0 | 0.6 | baseline10.png | Y | Same as above regarding noise and stability of currents. |
baseline11 | 12:02 | FEB scan | 2 | 0 | 0.96 | baseline11.png | Y | Noise jumped up. By about ~8ADC on APV0 and the other chips had a ~5ADC increase as well. |
baseline12 | 12:04 | FEB scan | 2 | 0 | 0.96 | baseline12.png | Y | Same as above overall. The noisy channel relatively smaller. |
baseline13 | 12:09 | FEB scan | 2 | 0 | 1.49 | baseline13.png | Y | Noise dropped to levels before baseline11? Similar shape as before. This is strange. |
baseline14 | 12:12 | FEB scan | 2 | 0 | 1.49 | baseline14.png | Y | Same as above. |
baseline15 | 12:15 | FEb scan | 2 | 0 | 0.6 | baseline15.png | Y | Noise dropped down by ~4ADC? Same shape as above. |
baseline16 | 12:20 | FEB scan | 2 | 0 | 0.0 | baseline16.png | Y | Noise increase by ~4ADC compared to previous run across most hybrids. Increase was 8ADC for apv0. Strange. |
baseline17 | 12:24 | FEB scan | 2 | 0 | 1.48 | baseline17.png | Y | The noise when down to levels similar to baseline15 above. Strange. |
0 | Power cycle of FEB and signal flange board (and hybrid). AVDD and V125 are now stable for about 2 mins before the next run was started. | |||||||
baseline18 | 12:27 | FEB scan | 2 | 0 | 0 | baseline18.png | Y | Edge channels now back up to 170ADC which causes the scale to be hard to compare again. Looks like noise is not so different in general compared to previous run. apv0 seem to be more flat in noise spectrum? At about 90% of the run there was a sudden "jump" in the noise across 9 channels on apv3 and apv4. Looks "digital"... |
baseline19 | 12:33 | FEB scan | 2 | 0 | 0 | baseline19.png | Y | Same as above except the spikes are not there. |
ramp up | During ramping the AVDD and V125 starts fluctuating. Could be induced by B-field but not obvious as we only saw this once for sure. The previous case (run 8) we didn't see it jump exactly during ramp to much lower field (0.3T). | |||||||
baseline20 | 12:40 | FEB scan | 2 | 0 | 1.48 | baseline20.png | Y | The system is now back to it's state with lower edge channel noise ~120ADC as above when AVDD and V125 were fluctuating. This again changes the scale so we need calibration plots. The shape and noise levels looks consistent with the runs above. |
12:42 | 1.48 | Power cycled FEB, signal flange and RxTest board. Note that field was ON here to test if we could get into a non-fluctuating state with field ON. Never got back to a state where the AVDD and V125 wasn't fluctuating. | ||||||
baseline22 | 12:45 | FEB scan | 2 | 0 | 1.48 | baseline22.png | Y | Consistent with runs above. Note that the magnet tripped off after about 90%. Please check with calibration plots if we can see any effect as a function of time on this one in particular. |
trip | Y | Magnet power supply tripped within the run baseline22 above. | ||||||
12:50 | 0 | Power cycled flange and FEB board. Cannot get into a state with non-fluctuating AVDD and V125 now, even if magnet is OFF. | ||||||
baseline23 | 12:49 | FEB scan | 2 | 0 | 0 | Y | Same as above. After ~90% we got the jump in noise on a couple of channels similar to run 18. |
...