Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Hovanes will setup a meeting with Hovanes, Krister and Dave Butler to finalize the list of items to be procured.
    • Once the required part numbers are identified, Hovanes will send the list to Marco for procurement.
  • Stepan has a Windows-based computer that may be suitable for RSLogix5000 installation.
  • Krister will try to use Hall D license until Hall B decides on license purchase.
  • Hovanes will prepare the description of the interlock system for people working on its development. 

Action Items

  1. OMS VME board and driver box (Krister)
  2. Computer setup for motor control (Hovanes)
  3. VME crate with a VxWorks controller for motor control (Hovanes)
  4. Paperwork for property transfer from JLab to SLAC (Stepan)
  5. Document describing the SVT interlock system (Hovanes)
  6. Setup a meeting with Dave Butler for PLC procurement. (Hovanes)
  7. Check the requirements for cable trays for power cable (Krister)