Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

TB No.1

TB No.2

TB No.3

TB No.4

TB No.5

September 26 Minutes &Material

October 24

December 5

January 23

February 27

  1. Consolidation of the Beamline Schedule (Marco, Stepan)
  2. ECAL review preparation (Raphael, Stepan, Marco)
  3. FY13 Budget endgame (Marco)
  4. Around the table, AOB (All)