FACET-II MD Shift Template (Word) (Google doc)

2024 End-of-Run MD programs and final data collection

...

WhiteParker
PriorityMD ItemProcedure Link

Machine Time

(shifts)

Responsible

Party

Needed ByPrerequisitesNotesComplete
3Injector setup for 10deg off Schottky zero crossing
3

TCAV0 operationalMaybe investigate smaller laser spot
3Laser spot size variationDiscussion with Glen...






4Very low bunch charge setup 



Laser spot size variation study

3Linac Ballistic Data
5




3S20 Ballistic Data



Good pencil beam config

S20 Quad BBA, energy feedback



3Individual mechanical<>magnetic offsets in L2

Loney



110-2 peak power 
1

Kalsi, Loney



Move peak power detection from WVG FWD to cavity probe. Follow up with RF and TID to get the Software diagnostics built out.Partial, watch & wait
1S20 BBAS20 BBA Procedure2

Kalsi

210/631/2024Stable low loss beam to FACET Dump

2-4Notch Collimator recommissioning
1+2Loney
Completion of RP Survey and Monitoring Plan parts N and QCurrent energy spread may not be compatible with clean cuts
2S20 matching studies/emittance in S20

S20 Emittance and Matching

1Loney
Good pencil beam config,
S20 Quad BBA,
S20 launch feedback


32nC running/instability investigation
2Loney

FJD interested
1Two-bunch prep/setupTwo-bunch config development82+Yocky, Majernik, Buschmann4/2 - 4/3 202411/1/24Stable, "nominal" short-bunch config (<20um emittance, <50um BLEN)

ideal: recover performance from June + more, need to discuss performance deficits with E300 crew

linked plan is for first ~2 shifts


4

BLEN sensitivities

BLEN Sensitivities MD
Kalsi



21

S20 BLEN Commissioning

S20 BL Commissioning Procedure0.5Kalsi10/31/2024Stable low loss maximally compressed beam to the FACET Dumpif dynamic range is improved, we can start analyzing measured sigZ vs. BLEN counts → may be possible to calibrate to some less arbitrary units
32Investigate orbit dependent matching into L2

Loney
BBA, working steering appFJD notes similar issue in LCLS–likely eta from BC1
13Complete ORM
Loney
Analysis tools 
Done?
2Tuning IP with smaller beta*

Yocky1Pencil beam configOct 13, 2022Kalsi
1Flag beam configFeb 2, 2024




3Learning data for MDL FF / Track hardware issuesOct 6, 2022
Perez, Loney



4RF kicks

Kalsi



4Linac BBA (rechecks)BBA Shift Plan
Loney



3Toroid ringing investigationSep 1, 2022
Kalsi



4Injector RF Standby triggering

Loney



3EPICS transverse feedbacks investigations2Automated Steering development

Buschmann
EPICS infrastructure, Cesargood R measurements and ability
to implement those into steering apptime
  • need to investigate corrector/BPM installations in LI12, LI15
  • simple to port LCLS transverse fast feedbacks per Mock

2L1 orbit stability studyOct 6, 2022
Parker



2RF stability (jitter, jumps, and djrift)Sep 15, 2022
Ripman, Parker



3PCAV 0 commissioning 
2Loney
Thing works 

21TCAV3 commissioningOctober 20242Loney
Thing works 

2DC magnet stabilitySep 29, 2022
Parker



2TCAV0 study (sigz v. Sch. phase, etc.)Oct 6, 2022 TCAV0 Shift Plan
Parker


Done?
1Linac wakefield bump tuning exploration

Yocky, Kalsi




Laser heater TTO
1Majernik3/11/24Requires foil replacement

3

Stability improvements to IN10 RF


2Cesar2/19/24
Implement in 10-5 first, then L0 stations, lastly 10-2
1 ?

Longitudinal Feedback Debugging

Commission S20 Correctors XC4FF, YC4FFXC4FF,YC4FF Commissioning Planshift plan draft0.5BuschmannKalsi10/31/24Stable low loss beam to S20Mainly forensicthe FACET Dump

2

BC14 chicane exploration

Test Bmad-based LEMMD shift plan draft0.5Buschmann10/31/24prototype LEM server GUI, stable beam to S20, recent PEDK

1Test python-based longitudinal feedbacks
2Buschmann12/31/24SC feedback ported, stable beam to S20Once port is developed, would like to test on DL10 + BC11
3Update ORM data
1Buschmann12/31/24stable Stable beam to S20s20data needed for transverse feedback developmentSoftware development/testing

Standby Machine Development (SMD)

...