Beamline Magnet
  • Frascati magnet test tests were successful, achieved 1100 A per coil. Dependence of the field versus current is taken. 
  • Next step is the miniT power supply controls. miniT power supply will not move, will stay where it is.
  • Pair spectrometer power supply will need to move downstream. All magnet and power supply moves are on Doug schedule. Hall B techs will help Krister with cabling the power supplies.
  • Krister will check with Charles Hightower about requirements regarding the power cables in the cables trays.
  • Takashi asked who will control the chicane power supplies. At this point it is Hall B, but it may be necessary to give the control to accelerator operators. 

...

  • Hovanes will setup a meeting with Hovanes, Krister and Dave Butler to finalize the list of items to be procured.
    • Once the required part numbers are identified, Hovanes will send the list to Marco for procurement.
  • Stepan has a Windows-based computer that may be suitable for RSLogix5000 installation.
  • Krister will try to use Hall D license until Hall B decides on license purchase.
  • Hovanes will prepare the description of the interlock system for people working on its development. 

Action Items

  1. OMS VME board and driver box (Krister)
  2. Computer setup for motor control (Hovanes)
  3. VME crate with a VxWorks controller for motor control (Hovanes)
  4. Paperwork for property transfer from JLab to SLAC (Stepan)
  5. Document describing the SVT interlock system (Hovanes)
  6. Setup a meeting with Dave Butler for PLC procurement. (Hovanes)
  7. Check the requirements for cable trays for power cable (Krister)