Support for October experiment

Refer to:

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901
. This page will be used to document the final configuration.

Plan: use IMS (user dumb) motors

What are the other motor requirements for Smith L-100752110075?

  • Nothing special. Standard configuration (quads, sample hexapod/stage)

Need:

  • Slits: in cabinet or TC?
  • Vacuum cables (4)
    • Verify presence and type of vacuum cables (Wednesday28 Sept)
  • Available flange ports (4)
    • Verify (Wednesday28 Sept)
  • Air cables (4)
    • Talk to Vincent (Tuesdaye-mailed on 27 Sept)
  • Available IMS motor channels (4)
    • Identify
    • To PR60 patch panel and/or direct to MForce chassis
  • Parameter manager settings
    • Christian to follow up with Vincent (some JJ Slit related XCS stage in pmgr)

...

Keep on list for new tasks. This is being tracked on Jira at

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-1125
.

Actions:

  • Have Maarten's confluence page reviewed
  • Make changes, especially to PLC side, if necessary
  • Assign resources
  • Fabricate
  • Test