Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

AMC Carrier

??????
TypeNameRevisionSub-GroupEng. Responsible# of Units for FY2018Bring Up ProceduresReady for ProductionStill needs to be testedKnown Issue
ATCAAMC CarrierC06CommonLarry R.352Documented on confluenceBeing EvaluatedBack plane timing

Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLTIMING-11

Double check radiated power with new chassis grounding

Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLCOMMON-154

  • JESD > 10 Gbps for cryo-det application
    • Working on C07 schematics/layout to fix this
    • However, C06 satisfies the LCLS-II requirements
ATCATiming FanoutC01Matt W.NoneWaiting for C01 prototype from assembly house TimingRic C.47
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLTIMING-13
Being Evaluated
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLTIMING-13
  • Flakiness of the front panel switch
 
RTMMPS/TimingC04MPSLarry R.NoneBeing Evaluated
  • Still need to evaluate the MPS digital inputs and digital outputs
 RTMDigital DebugC03Larry R.NoneIn layout queueJesus V.88
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLMPS-14
Ready for production  
RTMFast Wire ScanC00FWSJeff Olsen25
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLCOMMON-155
Being Evaluated
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLCOMMON-156
 
 
AMCGeneric ADC/DACC03CommonLarry R.228Documented on confluenceBeing Evaluated
Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLBPM-12
Sub-group evaluation
  • BCM: Approved
  • BLEN: Approved
  • Cavity Stripline: Still needs to evaluate
     
    AMCStripline BPMC04BPMAndrew YDocumentation exists but needs to be posted on board design confluence page???  AMCMPS Digital InputsC01Ryan H.None271

    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLBPM-11

    Ready for production  
    AMCMPS SFPC02MPSJesus VRyan H.None???  AMCTiming Digital I/OC00Matt W.None51
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLMPS-15
    Ready for production