Also, the PLC does not have a license (why?) and is run with the trial period. Otherwise it will just boot in config mode and will not run. The trial expires after 7 days, and must then be refreshed. Note that if the PLC is left running, it'll keep working, even after 7 days, but it won't be possible to reboot it until refreshed. Refreshing the trial is done from the PLC programming node. Hopefully a license will be installed soon.

Build: 4022.30

The screen for this stage is under 16-crystal vH - Y in the user panel.

...

Big translation stages (smart motors)

Parker stages. Require 2 cables with 4 pin plugs to Phoenix contact plugs contacts to properly power the motor and brakes. These cables should be found in (and returned to) the red cabinet next to the Von Hamos glass cabinet. The 35V Phoenix should be plugged into a 48V power source, and the 24V Phoenix to a 24V power source.

Also need 2 serial cables to connect to the digi.

Copy configuration from one of the beam monitor motion (MFX:DG1:MMS:07 for example).

...