Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • X=N-S
    Z=E-W
    Y=vertical
    X+ = north
    Z+ = west
    Y+ = top
  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


Task: add motor information to questionnaire:  

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4030
.

...

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Zyla

daq-mec-cam02

daq-mec-cam01

-c 0 -i "MecTargetChamber/0/Zyla/0"USB - fiber optic extender - USB via overhead cable tray dropping into R60.

Operational.

Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4009
.

Alviumdaq-mec-pgp01-s 036T9 04MMC -l 400000000

TBD Direct 8m cable from R62, partially via overhead rack.

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.

PendingOperational, and already removed.
Visar1daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.

DAQ/AMI-2 

ECS-1015 

IssueNotesStatus
XTCAVNeed to test.Not needed for this experiment, defer to Run 22.
AMI-2

Run AMI-2 with:

  • Quads (4)
  • VISARS (2)
  • Zyla (1)
  • Alvium (1)

Peregrine to create test framework, with guidance from Vincent.

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-1239
also merge with
Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
key