Page History
...
Run 5 XPP low gain calibrations
- see 14 Mar 12 CSpad meeting page for comments
- fullFrameAbsGain_xppcom10_lowGain_noFN.txt
- fullFrameAbsGain_xppcom10_lowGain_fn.fits
...
2014-03-19-CSPAD-CXI-DS1-Metrology.xlsx
May 2
...
, 2014 Files and comments from Gabriel about recent metrology work:
- The DS1 detector was rebuilt on March 12-17 2014.
- Thus for the DS1:
- the Milathianaki experiment and later should use the 2014-03-19 metrology
- the Yachandra experiment and earlier should use the previous 2013-12-20 metrology
- The DS2 should use the 2013-12-12 metrology
...
- The other XPP camera, happily sleeping in B33
2015-04-03 Quad1 MEC Alignment
2015-06-08 Quad1 MEC Alignment
2016-02-05 CSPAD CXI Camera2 Metrology
2016-02-05-CSPAD-CXI-Camera2-Metrology.xlsx (v2 with quad 3 from 20150120)
Gabriel Blaj: metrology file for CXI-Camera2-V16-20160205, replacing CXI-Camera2-V16-20150120, for all experiments taking place on or after February 05, 2016.
The only changes from the previous version are Quads 0 and 1.
References
Overview
Content Tools