Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Documentation: December 15, 2022

Image Added

Image Added

Homing procedure: HomeSearchSequenceType=MinusEndOfRunHomeSearch;


Motor controllers

Experiment → LI20 → MC03 (M5: EDC vertical) / MC02 (M7: EDC horizontal)

Introduction/Setup Description

...

Depending on dipole settings we should be able to see < 1 GeV up to the primary electron beam at 10 GeV.

Motor positions

Check Reference Motor positionsPositions for most recents numbers.

...