Category |
---|
Action Item | Assignee | Timeline | Status |
---|---|---|---|
Documentation | Review all diagrams and |
drawings. | Bo |
, Thi | 2024 |
| ||||||||
Hardware Design |
Update HMC1119 Variable Attenuator PCB. | Thi | December 2023 |
| |||||||||
Hardware Design | Build MO-LO Power Supply Chassis with +8V/+18V switching supplies. | Thi | April |
2024 |
| ||||||||
Miscellaneous |
Set up long-term test environment for HMC1119 Variable Attenuator testing. | Thi | April 2024 |
| |||||||||
Miscellaneous | Receive access to lcls-srv01. | Thi | April 2024 |
| ||||||||
Procurement |
Follow-up with Nate on procurement timeline. | Bo | April 2024 |
| |||||||||
Testing | HMC1119 Variable Attenuator long-term testing. | Thi | May 2024 |
| ||||||||
Testing | Set up the HE PRL system in the lab for PCB, PA and system integration. | Bo and Thi | 2024 |
|