Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Step No

Description

Initials

Date

Comments


1

Cryomodule Position (CM01, CM16, etc.)

 

 

 


2

Before cooldown of cryomodule under test, enter housing and check module for connected cables:
Cavity 1 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


3

Cavity 2 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


4

Cavity 3 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


5

Cavity 4 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


6

Cavity 5 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


7

Cavity 6 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


8

Cavity 7 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


9

Cavity 8 Flange:
Connectors A-01, A-02, A-03, B-01 and B-07

Flange 'B':
N type connector. PROBE cable

These are for the 50 ohm loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 


10

Flange 'C': These are for the magnets.
Connectors C-01-A, C-02-A, C-03-A, C-04

 

 

 


11

Flange 'D': These are for the BPM.
Connectors D-01 (top), D-02(right), D-03(bot), D-04 (left)

 

 

 

Step No

Description

Initials

Date

Comments


12

Flange 'D': These are for the cool down heater.
Connectors D-07, D-08 (LL heater)

 

 

 


13

Flange 'E': These are for the liquid level DS probes.
Connector E2-01 and Pressure sensor.
Verify there is external He gas to these flanges.

 

 

 


14

Flange 'L': These are for the liquid level US probes.
Connector L2-01 and Pressure sensor
Verify there is external He gas to these flanges.

 

 

 


15

Flange 'F': These are for the temp sensors for magnet package.
Connector F-01 and F-02

 

 

 


16

Flange 'K': These are for the temp sensors for Cryo.
Connector K-01, K-02, K-03 and K-04 (heater)

 

 

 

17

Flange 'B': These are for the loads for HOMs.
N type connectors. HOM1 and HOM2

 

 

 

18

Flange 'B': These are for the probe cable.
N type connector. PROBEShouldn't these be included in steps 2-9?

 

 

 

19

WR650: Verify all cavity waveguides are complete.

 

 

 

2018

Verify forward and reverse power cables are connected to the directional couplers for all eight cavities
Note any problems or unusual conditions in the comment block.

 

 

 

2119

Go to klyston gallery. In all likelihood, folks will check as many CM downstairs as possible before going upstairs, but it doesn't make for a pretty, per-CM procedure...
Verify the WR650 is still pressurized and connected to the SSAs for cryomodule under test

 

 

 

2220

Inspect cable connections to RF racks for disconnected cables. DO NOT OPEN DOORS OF RACKS. If there is a concern, note in comments and call LLRF Group.

 

 

 

Step No

Description

Initials

Date

Comments

2321

Go to Operator console.
Open LLRF Interlocks Display. Click on each "More" for each interlock to go to detail screen.

 

 

 

2422

Note any unresolvdisconnected disconnected PVs in the comment box.

 

 

 

2523

Push the 'Reset Interlocks' button. Note any faults which do not clear or reappear in the comments block.

 

 

 

2624

Verify that the Beamline Vacuum signal readback is correct. Record the Beamline Vacuum pressure in TtorrTorr. Note any problems in the comment block.

 

 

 

Step No

Description

Initials

Date

Comments

2725

Open the Cryomodule Instrumentation display.

 

 

 

2826

Verify that the Coupler Vacuum signal readback is correct. Record the Coupler Vacuum pressure in TtorrTorr. Note any problems in the comment block.

 

 

 

2927

Verify that the Stepper Motor temperature readbacks is correct. At room temperature it should be about ~300K. Note any unusual readbacks in the comments block.

 

 

 

3028

Verify that the FPC Top and Bottom Temperature readbacks are correct. At room temperature it should be about ~300K. Note any unusual readbacks in the comments block.

 

 

 

_GoBack

Step No

Description

Initials

Date

Comments

3129

Verify that the Helium Lines (Shield, F, E, D, C, A and B) temperature instrumentation is connected to the data acquisition systems and that the I think we could dump the "is connected ... and that the" because the same language is used in steps 29 & 30readback is readback is correct. At room temperature they should read about ~300K. Note any unusual readbacks in the comments block.

 

 

 

3230

Verify that the Helium Vessel and HOM Copper Clamp RTD's readbacks are correct. Note any problems in the Comment block.

 

 

 

3331

Verify Downstream Liquid Level Probe and Upstream Liquid Level Probe readbacks are correct. May read "100%" at room temperature. Note any problems in the Comment block.

 

 

 

3432

Verify that Pressure Transducers (100 Torr and 5000 Torr) are properly connected to the cryomodule and that each readback is correct. Note any problems in the comment block.

 

 

 

3533

Verify that Liquid level heaters are properly connected to the cryomodule and that each readback is correct. Prior to cooldown they should read "0".
Note any problems in the comment block.

Anchor
_GoBack

 

 

 

3634

Verify that Cavity heaters are properly connected to the cryomodule and that each readback is correct. Prior to cooldown they should read "0". Note any problems in the comment block.

 

 

 

3735

Verify that Cooldown and magnet heaters are properly connected to the cryomodule and that each readback is correct. Prior to cooldown they should read "0". Note any problems in the comment block.

 

 

 

3836

Verify that JT and CD Valve Actuator is reading back properly.
List any problems in the comment block.

 

 

 

3937

Scroll to bottom of Cryomodule Instrumentation display

 

 

 

4038

Verify Magnet Diode'stemperaturestemperatures are connected to data acquisition. Verify that each readback is correct. At room temperature all values should be ~300K. Note any problems in the Comment block.

 

 

 

4139

Verify that all preceding Cool Down Preparation steps have been completed and that all requested information has been entered into the appropriate fields.

 

 

 

4240

Transmit completed checklist to Area Physicist.