Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page is for specifying the set of conditions that will be accessed through the conditions database.
The initial focus of this page is for the needs of the test run in 2012. In order to properly prepare the
database the quantity and types of conditions, frequency of updates and whether the loading can
be triggered by the run# or if not please specify precisely what will be needed. The subsystems
are specified below. Please modify the list as needed.

beam conditions

Tasklist
titlebeam conditions
beam energy
beam position
beam intensity
parasitic
beam type

trigger configuration

Tracker

EMC

Muon

data quality