Beam line (Marco and Stepan)
Things ok. Al vs SS. No issue with building it with Al. Progressing with downstream beam line. Upstream with analyzing chamber and coupling to ECAL vacuum progressing.
Wire scanner integrated with target (horizontal and vertical). Wires on detector can be incorporated with silicon. Wire scanner after tracker is y scanner. Stepan points out there is a beam position on faraday cage 40 m downstream. Takashi points out that 1st layer horizontal +-1mm last layer +-5mm.