Amanda's doc: RGA Cart Maintenance and Operation
Start up procedures:
general prep
- if you're not hooking the cart up to another chamber, no prep needed.
-
- if you are hooking the cart up to another chamber:
...
valve in to the other chamber only after qualifying the cart itself first with Peter Stefan.
Cart specifics (assumes you've done the prep listed above)
Carts 1 & 2
Cart startup procedure:
CAUTION: plugging the cart in to an electrical socket will immediately start up the roughing pump.
(section to be completed)
turbo controller, bottom right:
Carts 3 & 4
These are level 3 carts. they canaren't (and won't make be) level 1 because they have some rubber seals.
...
- Open the gate valve on top of the turbo
- When turbo hits ~200Hz~100Hz: Turn on the CCG
- Wait for turbo to settle at 1000Hz and 1A (info on display).
...
- open the N2 cylinder and regulator
- confirm N2 is coming out of the cart’s PRV
- close the gate valve on top of turbo
- hit Stop (also F1). This stops the turbo + roughing, and automatically vents through the turbo.
- open the small N2 valve on left side of cart, this vents N2 above the closed gate valve.
- wait for vent to complete, confirm N2 is coming out of the cart’s PRV
- close the small N2 valve on left side of cart, close the N2 cylinder
Cart 5
venting/purging system
Shut down
(to be filled)
General
carts 1 and 2
carts 3 and 4
cart 5
Trouble Shooting:
general:
roughing pump
valves
documentation:
Turbo:
carts 1
...