Scans taken with the DAQ
E-log entry | Comments | Misc | |
---|---|---|---|
02/18/2024 02:35 F2_S20Config.m Sector 20 Config Change | |||
X-T scan (horizontal/x-position vs. timing); laser list is missing (scalars); looks like the time window was too small | |||
D-T scan (pulse duration vs. timing) | |||
T scan | |||
Background (ATTENTION: espec was changed just before this scan) | |||
02/18/2024 04:45 F2_S20Config.m Sector 20 Config Change | |||
X-T scan
Verify laser intensity (max: 119)
KES
First iteration, beam only
...
- We re-covered collisions at ~ 1251.7758. Gas Jet: 1252.4095 - 0.6485 (path difference) → 1251.761 (units: ns); difference: window in/out