Motor Configuration
From Eric on LCLS coordinate systems:
- X=N-S
Z=E-W
Y=vertical
X+ = north
Z+ = west
Y+ = top - But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.
Task:
. Jira server SLAC National Accelerator Laboratory serverId 1b8dc293-975d-3f2d-b988-18fd9aec1546 key ECS-4030
Stage | IOC | PV | Cabling | Parameter Manager Config | Status | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Talbot Y: Micos PLS-85 #1 | ioc-mec-usrppl-ims | MEC:USR:MMS:2425 | To HDB 15 to PR60 patch panelNeed cable CA-261-805-23-C00 | MEC/PLS-85 In-Air | Operational. Check directions. | ||||||||||||||||
Talbot : Micos PLS-85 #2X: Newport UTS100PP | ioc-mec-usrpplppl-imsxps3 | MEC:USRPPL:MMSMMN:25 | To PR60 patch panel Need cable | MEC/PLS-85 In-Air | 24 | Direct in-air cabling. | Newport | Operational. Check directions. | |||||||||||||
Talbot Z: Newport UTS100PPTalbot: Newport TBD | ioc-mec-ppl-xps3 | MEC:PPL:MMN:23 | Using XPS2 #8 cable (on beampipe) to XPS3 #7 Direct in-air cabling. | Newport | Operational. Check directions. | ||||||||||||||||
East Lens GHIJ: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[17-19] | Using XPS3 #1-#3 cables, Flange B *1 - *3. Waiting on axes assignment confirmation Newport. | Newport | Operational. 17: -SW +NE 18: -UP +DOWN 19: Check directions. Eric's advice worked: Kill then Re-init/Home. To do:
| ||||||||||||||||
West Lens ABEF: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[20-22] | Using XPS3 #4-#6 cables, Flange B *4 - *6. Waiting on axes assignment confirmation Newport | Newport | Operational. 20: -S +N 21: -UP +DOWN 22: -W +E To do:
| ||||||||||||||||
VISAR Lens: XYZ | ioc-mec-ppl-xps3xps2 | MEC:PPL:MMN:[09-11] | TBD | Newport | XPS2 #1-#3 cables come into bottom SW flange. | Newport | Operational. 9: -N +S 10: -UP +DOWN 11: -E +W | ||||||||||||||
JJ Slit: X | ioc-mec-tc1-vt21hv-ims | MEC:TC1:MMS:[17,18] | We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS". Routing is R64B to North side of target chamber via overhead cable trays. This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP). A new drawing and CAPTAR tags need to created. | XPP/JJXGap00 XPP/JJXOff00 | Running without limit switches. Need to diagnose and correct. Also 17: -N +S 18: -OPEN +CLOSE | ||||||||||||||||
JJ Slit: Y | ioc-mec-tc1-fwheels-ims | MEC:TC1:MMS:[01,02] | XPP/JJXGap00 XPP/JJXOff00 | Running without limit switches. Need to diagnose and correct. Also 01: -DOWN + UP 02: -OPEN +CLOSE |
Detector Configuration
Detector | DAQ Host | DAQ Configuration | Cabling | Status | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Epix10kaQuad0 | daq-mec-pgp02 | -i 0 -P 0x10 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | ||||||||
Epix10kaQuad1 | daq-mec-pgp02 | -i 1 -P 0x20 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | ||||||||
Epix10kaQuad2 | daq-mec-pgp02 | -i 2 -P 0x11 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | ||||||||
Epix10kaQuad3 | daq-mec-pgp02 | -i 3 -P 0x21 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | ||||||||
Zyla |
daq-mec-cam01 | -c 0 -i "MecTargetChamber/0/Zyla/0" | USB - fiber optic extender - USB via overhead cable tray dropping into R60. | Operational. Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see
. | ||||||||
Alvium | daq-mec-pgp01 | -s 036T9 04MMC -l 400000000 | TBD Direct 8m cable from R62, partially via overhead rack. Will be in target chamber (air only) for spot size measurement. Cable returned to Vincent, will askspatial overlap measurement. (one day max). Vincent has cables available. | Operational, and already removed. | ||||||||
Visar1 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OKOperational. | ||||||||
Visar2 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OKOperational. |
DAQ/AMI-2
Issue | Notes | Status | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Not needed for this experiment, defer to Run 22. | ||||||||||
AMI-2 | Run AMI-2 with:
Peregrine to create test framework, with guidance from Vincent.
|