Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

General

  • Required fields for all jobs:
    • Type of Job
      • Default Type of Job
    All jobs must have the "Type of Job" field and must have a "Project" and/or an "Experiment"
    • If appropriate (it generally will be) also set "Who is leading"
    • All other fields are optional
    • Default "Type of Job"
      • is "Misc." if it is not any of the other options
  • To do: Add "tool tip" info to fields
    • Project and/or Experiment
      • A Project can either stand alone or be a part of an Experiment
    • Who is leading (If appropriate)
  • All other fields are optional
  • If a job should be suppressed from the sharable schedule, set the Detailed View field

PAMM specific