Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
XRTS
Detector NumberTypeFunctionIn DAQ?NotesCabled?Running?Comments
1ePix100asingle photon diagnosticsYesin-vacYesYes

etch 12; vertical holder

Q0

ePix0

Q2 fibers/PDU

2ePix100a

Kalpha

User spectrometersingle photon diagnostics

Yesin-vacYesNoYes

etch 25; horizontal holder

Q1

Not in TC yet.

Q3 fibers/PDU

3ePix100asingle photon diagnosticsXRTSYesin-vac

No


Yes

ePix0

Q2

etch 12; vertical holder

Q0 fibers/PDU

Recovering from water spill.

4


ePix100a

Kalpha

User spectrometersingle photon diagnostics

Yesin-vacYesYes

Q3

etch 25; horizontal holder

Q1 fibers/PDU

5ZylaMXIYesin-airYesYes

zyla_xray_east

Restart procedure at Zyla and iStar confluence page.

Host is daq-mec-cam02.

6XTCAV
Yesin-vacYesYes

ePix100a SPC vertical → Q0 fiber & PDU S0

...

ePix100a Kalpha → Q3 fiber & PDU S3fiber mapping is currently the same as for 4x quads. This needs to be changed!

Update on Fiber Mapping: (see 7.11 Opal Camera Configuration for fiber patch panel information)

  • Commenting out epix100a_2_XRTS and setting "-i 2" for epix100a_3_Kalpha worked (but keeping -P 0x40) worked, and I checked via image inspection that I saw two different detectors.
  • The epix100a persisted all day across nearly complete fiber changes - so the DAQ config is the issue (and the IOC was ok).
  • In detail: Dimitri and I got into the fiber routing behind the Quad connections in PR60 since we suspect cable problems coming into cam01. So now cam01 has both the direct fiber bundle and the Fiberstore QSFP-SR4-40G that was in one of the two pgp02 ports. We don't need the quads again until late Feb, so can sort this out post L10011.