Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Motor Configuration

From Eric on LCLS coordinate systems:

  • X=N-S
    Z=E-W
    Y=vertical
    X+ = north
    Z+ = west
    Y+ = top
  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


Task: 

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4030
.


StageIOCPVCablingParameter Manager ConfigStatus

Newport UTS150PPV6

Image Removed

Talbot Y: Micos PLS-85 #1

ioc-mec-usrppl-ims

MEC:USR:MMS:25

HDB 15 to PR60 patch panel

CA-261-805-23-C00


MEC/PLS-85 In-Air

Operational. Check directions. 

Talbot X: Newport UTS100PP

ioc-mec-ppl-
xps2
xps3MEC:PPL:MMN:
13Standard Newport connection from mcn-mec-tch2.OK

Micos 6237-C002

Linear Stage, 40mm travel, HV, VSS-42 motor, 16:1 VPGL gear

Reference: https://www.pi-usa.us/en/products/precision-motorized-linear-stages

Image Removed

ioc-mec-usrppl-ims

MEC:USR:MMS:25

(formerly XTCS Rotation)

PR60 Patch Panel - DB9 Flange Connection "#4" - Stage. Using cable labeled "RS 422 Rotation Stage".

Note: Not connecting DB9 from Micos stage containing limit switch information.

Micos_6237

PM: We measured the downward and upward motions in response to 5 mm requests. Downward is fine, but upward stops and starts. We recommend cleaning.

EG: We don't go to the limits when they are not reliable, we set soft limit 1mm before and after the limits to make sure we don't reach them.I'll be down in the hutch in the afternoon and can have a look at it.

UPDATED: Verified working with Eric and Hae Ja 12/09/23. Success was achieved by greasing the drive shaft of the motor and increasing the run current and run current % to 20 for both. This value, while high, allows for the consistent movement of the stage with the added weight of the pushers.

24

Direct in-air cabling.

Newport

Operational. Check directions. 

Talbot Z: Newport UTS100PP

ioc-mec-ppl-xps3

MEC:PPL:MMN:23

Direct in-air cabling.


Newport

Operational. Check directions. 

East Lens GHIJ: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[17-19]

Using XPS3 #1-#3 cables, Flange B *1 - *3.

Newport

Operational.

17: -SW +NE

18: -UP +DOWN

19: Check directions.  Eric's advice worked: Kill then Re-init/Home.

To do: 

  • secure vacuum side connections with cable ties

West Lens ABEF: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[20-22]

Using XPS3 #4-#6 cables, Flange B *4 - *6.

Newport

Operational.

20: -S +N

21: -UP +DOWN

22: -W +E

To do: 

  • secure vacuum side connections with cable ties

VISAR Lens: XYZ

ioc-mec-ppl-xps2

MEC:PPL:MMN:[09-11]

XPS2 #1-#3 cables come into bottom SW flange.Newport

Operational.

9: -N +S

10: -UP +DOWN

11: -E +W

JJ Slit: X

ioc-mec-tc1-vt21hv-ims

MEC:TC1:MMS:[17,18]

We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS".

Routing is R64B to North side of target chamber via overhead cable trays.

This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP).

A new drawing and CAPTAR tags need to created.

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct.  Also

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

17: -N +S

18: -OPEN +CLOSE

JJ Slit: Y

ioc-mec-tc1-fwheels-ims

MEC:TC1:MMS:[01,02]

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct. Also

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

01: -DOWN + UP

02: -OPEN +CLOSE

Micronix VT-50-12316

https://micronixusa.com/product/download/7XReVO/universal-document/xVze6v/VT-50L_Datasheet_v1.5.pdf

VT-50L-12316

Motor Type
Stepper Motor
Limit Switch
Mechanical
Environmental Options
High Vacuum 10-6 mbar
Travel Range
100 mm
Encoder Option
Digital (RS-422)

Image Removed

ioc-mec-usrppl-ims

MEC:TC1:MMS:22

(formerly XTCS Filter Wheel)

PR60 Patch Panel - DB15 Flange Connection "5" - StageVT-50-100

PM: We have verified the cabling for the VT50 out to the cable that comes from the stage. Even when using a VT50 parameter set verified from CXI we saw no motion of the stage.Suggest mechanical inspection.

UPDATED: Verified working as of 12/09/23 with Eric and Hae Ja. Solution was using the labelled VT50L cables connected to port 5 on the patch panel.



Detector Configuration

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760
Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange -  - DetectorOK
Unchanged since L-10075.Operational.
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760
Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange -  - DetectorOK
Unchanged since L-10075.Operational.
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760
Host card 1-  (via overhead cable tray - back of PR60 - PR60 patch panel - Flange  - Detector
Unchanged since L-10075.Operational.
OK
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760
Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange - DetectorOKepix100a_1_XTCS
Unchanged since L-10075.Operational.
Zyla

daq-mec-cam02

daq-mec-cam01

-c 0 -i "MecTargetChamber/0/Zyla/0"USB - fiber optic extender - USB via overhead cable tray dropping into R60.

Operational.

Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see

-i 1 -P 0x20 -G -T -R 0 -D 0x1770Host card 0 - R60 E33 RHS patch panel (connection #3) - (via overhead cable tray) back of PR60 - PR60 patch panel - Test Flange - Detector

Working on DAQ and AES driver issues.

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4009
.

Alviumdaq-mec-pgp01-s 04MMC -l 400000000

Direct 8m cable from R62, partially via overhead rack.

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.

Operational, and already removed.
Visar1
Epix10ka_1
daq-mec-
cam01
misc01-i MecTargetChamber/0
-T -P 0x20 - R 0 - D -x1770Host card 0 - R60 E33 RHS patch panel (connection #3) - (via overhead cable tray) back of PR60 - PR60 patch panel - Test Flange - Detector

DAQ/IT issues with high UDP packet oss rates on 10Gb fiber connection to DAQ.

Von Hamos Configuration

Components:

...

  • Requires Windows machine connected to ICS subnet.
  • Windows PC 
  • Replaced PC with Raspberry Pi
    • The Ii is connected to port 13 of stack 8
    • The IP address was already set as 172.21.46.200. You can login with username fifteen and password *LCLS*MEC*

...

/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.

DAQ/AMI-2 

IssueNotesStatus
XTCAVNeed to test.Not needed for this experiment, defer to Run 22.
AMI-2

Run AMI-2 with:

  • Quads (4)
  • VISARS (2)
  • Zyla (1)
  • Alvium (1)

Peregrine to create test framework, with guidance from Vincent.

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-1239
 

...