Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

  1. MC software and production updates - Tongtong
  2. Intro to OSG for HPS - Nathan
  3. SVT calibration/alignment status - PF
  4. 2019 Reconstruction Readiness - Norman
  5. MC needs2019 Reconstruction Readiness
  6. AOB/Questions

Notes:

Reconstruction Readiness: 

MC Software: Tongtong presented the steps taken to produce a sample of radiative mu+mu- events ( pass0 of muon trident for 2019 MC ). He also implemented an FEE trigger simulation (git iss735) to be used for FEE studies.

MC Production:  Tongtong has produced a sample of FEEs to be used to characterize the SVT momentum resolution. Cameron will produce additional samples of WAB LHE files 

HPS@OSG: Nathan presented a status report on initial attempts to use the OSG for MC production. A number of issues need to be resolved, but a pathway exists for testing.

SVT Alignment / Calibration: PF discussed some remaining issues with the alignment. Alignment using the FEEs appears to have plateaued, will start working with V0 skims.

MC Needs: A discussion ensued on the Monte Carlo needs for the 2019 analysis. This needs input from the analysis groups. What is the scale of the operation in terms of number and type of events, CPU, disk / tape storage, etc.2019 Reconstruction: