Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

AMC Carrier

  
TypeNameRevisionSub-GroupEng. Responsible# of Units for FY2018Bring Up ProceduresReady for ProductionStill needs to be testedKnown Issue
ATCAAMC CarrierC06CommonLarry R.352Documented on confluenceBeing Evaluated

Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLTIMING-11

Jira
serverSLAC National Accelerator Laboratory
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyESLCOMMON-154

  • Back plane timing
    • Issues with C05 (or earlier) timing distribution
    • Being evaluated for C06 by Matt W.
  • Double check radiated power with new chassis groundingBeing evaluated by Mitch

    • JESD > 10 Gbps for cryo-det application
      • Working on C07 schematics/layout to fix this
      • However, C06 satisfies the LCLS-II requirements
    ATCATiming FanoutC01NoneWaiting for C01 prototype from assembly house TimingRic C.47
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLTIMING-13
    Being Evaluated
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLTIMING-13
    • Flakiness of the front panel switch
     
    RTMMPS/TimingC04None (who's responsible?)Being Evaluated
    • Still need to evaluate the MPS digital inputs and digital outputs
     MPSJesus V.88
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLMPS-14
    Ready for production  
    RTMFast Wire ScanC00FWSJeff Olsen25
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLCOMMON-155
    Being Evaluated
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLCOMMON-156
    RTMDigital DebugC03NoneIn layout queue 
     
    AMCGeneric ADC/DACC03CommonLarry R.228Documented on confluenceBeing Evaluated
    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLBPM-12
      
           
    AMCStripline BPMC04BPMAndrew Y271

    Jira
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLBPM-11

    Ready for production   
    AMC MPS SFP C02 MPS Jesus V. 51 
    Jira
            
    serverSLAC National Accelerator Laboratory
    columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
    serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
    keyESLMPS-15
    Ready for production