Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

2014-03-19-CSPAD-CXI-DS1-Metrology.xlsx

...

  • The DS1 detector was rebuilt on March 12-17 2014.
  • Thus for the DS1:
    • the Milathianaki experiment and later should use the 2014-03-19 metrology
    • the Yachandra experiment and earlier should use the previous 2013-12-20 metrology
  • The DS2 should use the 2013-12-12 metrology

...

  • The other XPP camera, happily sleeping in B33

 

 

 

References